Business

Granada Gold Mine Intersects 14.5 g/t Au over 4 Metres including 55.9 g/t over 1 Metre in Deep-Hole Drilling at the Footwall of the Feldspar Porphyry

Granada Gold Mine Intersects 14.5 g/t Au over 4 Metres including 55.9 g/t over 1 Metre in ...

articleGranada Gold Mine Inc.January 18, 20175/company/granada-gold-mine-inc/news/granada-gold-mine-intersects-145-gt-au-over-4-metres-including-559-gt-over-1-metre-in-deep-hole-drilling-at-the-footwall-of-the-feldspar-porphyry
Granada Gold Mine Intersects 14.5 g/t Au over 4 Metres including 55.9 g/t over 1 Metre in Deep-Hole Drilling at the Footwall of the Feldspar Porphyry

About this update from Granada Gold Mine Inc.

[{"type":"text","content":"\n\n\n\nGranada Gold Mine Intersects 14.5 g/t Au over 4 Metres including 55.9 g/t over 1 Metre in Deep-Hole Drilling at the Footwall of the Feldspar Porphyry\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n\n\n\n\n\n\n\nCanada NewsWire\nROUYN-NORANDA, QC, Jan. 18, 2017\n\n\n\nResults Support Extension at Depth of High-Grade Mineralization and Resource Expansion Potential at Granada\n\n\n\nROUYN-NORANDA, QC, Jan. 18, 2017 /CNW/ - Granada Gold Mine Inc. (TSX-V: GGM) (OTCPINK: GBBFF) (Frankfurt B6D) (the \"Company\" or \"Granada\") today announced preliminary drilling results from its 8,000-metre deep-hole drilling program initiated in December 2016 at the Granada Gold property near Rouyn-Noranda, Quebec. The program was initiated to test the Granada high-grade gold vein system north of the existing pits in an area not previously included in resource estimates (news release December 2, 2016).\n\nHole GR-16-14, the first deep hole drilled for this program, intersected 14.5 grams/tonne (g/t) Au over 4 metres (m) including 55.9 g/t Au over 1m at 881m and 7.3 g/t Au over 1 m at 710m.\n\n\"We are highly encouraged by these drill results. This is one of the best intercepts at depth of all of our drilling over the years at Granada and is from an area not previously included in resource estimates. The results demonstrate high-grade gold mineralization continuity on the property and support the resource expansion potential at Granada and the Company's current geological model,\" stated Frank Basa, President and CEO.\n\n\"Deep-hole drilling is continuing at the property and further results can be expected in the weeks ahead. We intend to continue drilling over the coming two years with the goal of doubling the size of the deposit, which remains open in all directions and at depth. The estimated 5.5 km east-west strike length is still approximately 80% unexplored. We look forward to further developing this deposit into a significantly larger asset for the benefit of shareholders of Granada Gold Mine,\" Mr. Basa added.\n\nThe drill results support the ext...

More updates from Granada Gold Mine Inc.