Business

Granada Gold Intersects 5.5 g/t Au Over 6 Meters Including 31.3 g/t Au Over 1 Meter During Infill Drilling

(TheNewswire) These new intercepts verify the continuity of mineralization at...

articleGranada Gold Mine Inc.December 6, 20214/company/granada-gold-mine-inc/news/granada-gold-intersects-55-gt-au-over-6-meters-including-313-gt-au-over-1-meter-during-infill-drilling
Granada Gold Intersects 5.5 g/t Au Over 6 Meters Including 31.3 g/t Au Over 1 Meter During Infill Drilling

About this update from Granada Gold Mine Inc.

[{"type":"text","content":"Granada Gold Intersects 5.5 g/t Au Over 6 Meters Including 31.3 g/t Au Over 1 Meter During Infill Drilling \n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n These new intercepts verify the\ncontinuity of mineralization at shallow depth and confirm extension of\nthe multiple mineralized structures\n \n \n \n \n Rouyn Noranda, Q.C. -\n \n \n TheNewswire\n-\n \n \n December 6, 2021 -\n \n \n Granada Gold Mine Inc. (TSXV:GGM) (OTC:GBBFF) (Frankfurt:B6D)\n(the “Company” or “Granada”)\n \n \n is pleased\nto announce additional results from its on-going drill program at its\nGranada Gold project with multiple new gold assays from its GR-21-22,\nGR-21-23, GR-21-24 and GR-21-25 drill holes with grades up to 31.30\ng/t over 1.00m, 11.70 g/t over 1.00m, and 10.05 g/t over 0.50m.\n \n \n \n \n Drilling Highlights\n \n \n \n \n \n \n Drill holes GR-21-22, GR-21-23, GR-21-24 and GR-21-25\nwere designed to confirm the presence of gold mineralization at\nshallow depth.\n \n \n \n \n \n \n The drill holes were aimed to fill gaps in the SGS\nmineral resources envelopes, with the potential of increasing the\ntonnage of the high-grade, open-pit resource grade of 2 grams per\ntonne gold.\n \n \n \n \n \n \n GR-21-22 intersected\n \n \n \n \n \n \n \n 1.25g/t Au over 7.75m\n \n \n \n \n \n \n \n \n GR-21-23 intersected\n \n \n \n \n \n \n \n 5.54 g/t Au over 6.00m, including 31.30 g/t Au\nover 1.00m\n \n \n \n \n \n \n \n \n GR-21-24 intersected\n \n \n \n \n \n \n \n 0.78g/t Au over 11.70m, including 5.40 g/t Au\nover 0.60m\n \n \n \n \n \n \n \n \n GR-21-\n \n \n 25 intersected\n \n \n \n \n \n \n \n 1.14 g/t Au over 5.1m, including 10.05 g/t Au\nover 0.50m\n \n \n \n \n \n \n \n \n \n \n \n \n “The assay results from these drill holes prove the\ncontinuity of mineralization along the main Granada central structure.\nAlso, the 30,000-meter drill program we conducted over the past year\nhas confirmed that the average assays of the down-dip results of the\nmineralized structure are consistently higher than the previous\nperpendicular-to-structure drill results. The company is planning\nanother bulk sample similar in size as the previous one taken to get a\nbetter understanding of the correlation to drill data results. We\nexpect the bulk sample results t...

More updates from Granada Gold Mine Inc.