Business
Goliath Resources Drills 59.1 Meters of Continuous Sulphide Mineralization Confirming a Mineralized Footprint of 5.25 Square Kilometers; System Remains Wide Open in All Directions
Drill Highlights: 100% of all holes completed to date on the Surebet discovery have intersected significant zones of sulphide mineralization confirming a minera

About this update from Goliath Resources Limited
[{"type":"text","content":" Drill Highlights: 100% of all holes completed to date on the Surebet discovery have intersected significant zones of sulphide mineralization confirming a mineralized footprint of 5.25 square kilometers; system remains wide open in all directions (see map below). Assays are pending on all 2022 drill holes and will be reported once received compiled and interpreted. An accompanying infographic is available at Click Here Hole GD-22-31 collared from Pad 15 (1344 meters step-out from Surebet Main) intersected 2 intervals of robust sulphide mineralization from 16.43 meters to 18.38 meters (interval 1.95 meters*) and from 160.90 meters to 220.00 meters (interval 59.10 meters*) (see image below). Mineralization primarily consists of fracture-fill stringers of pyrrhotite and pyrite, hosted in porphyritic andesite. A second interval intersected 98.99 meters of mainly disseminated sulphide mineralization associated with quartz-chlorite-epidote veining from 3.17 meters to 102.16 meters (98.99 meter* interval). An accompanying infographic is available at Click Here Hole GD-22-38 drilled from Pad 11 (1344 meters step-out from Surebet Main) intersected a significant interval of continuous breccia and vein stockwork containing sulphide mineralization from 43.00 meters to 81.70 meters (38.7 meters* interval) consisting of stringers and aggregations of semi-massive to massive pyrrhotite, chalcopyrite and pyrite (see image below). An accompanying infographic is available at Click Here Hole GD-22-39 collared from Pad A (1205 meters step-out from Surebet Main) intersected 28.20 meters* of sulphides, quartz veining and brecciation hosted in siltstone from 81.10 meters to 110.00 meters containing interstitial pyrrhotite, galena, sphalerite and chalcopyrite in veins and stringers (see image below). An accompanying infographic is available at Click Here Hole GD-22-37 collared from Pad 9 (1430 meters step-out from Surebet Main) contains 14.74 meters* of significant sulphide mineralization hosted in a siltstone unit containing quartz veinlets with interstitial to net-textured pyrrhotite, sphalerite and pyrite from 58.56 meters to 73.30 meters. It also contains a section of porphyritic andesite with pyrrhotite-pyrite stringer and disseminated sulphides from 170.00 meters to 192.00 meters (interval 22 meters*), past the contact between sediments and underl...