Business
All Holes Drilled to Date Hit Broad Sulphide Mineralization Up to 135 Meters Wide* at Goliath’s Golddigger Property, Golden Triangle, B.C.
New Extension Target drill highlights: 100% of all three drill holes completed to date on the New Extension Target at its Golddigger Property have intersected b

About this update from Goliath Resources Limited
[{"type":"text","content":" New Extension Target drill highlights: 100% of all three drill holes completed to date on the New Extension Target at its Golddigger Property have intersected broad zones of significant sulphide mineralization up to 135 meters wide*. Assays are pending on all three holes and will be released once received, compiled, and interpreted. These significant intercepts confirm the presence of an extensive mineralizing system at depth and high potential for linear, widespread mineralized bodies that remain open in all directions. The type of mineralization (including semi-massive to massive pyrrhotite and pyrite), textures (including veining, stockwork and brecciation) and alteration (chloritization, silicification, epidotization) observed in the New Extension Target located in the underlying volcanics are similar to what has been observed in drill holes and at surface on the Surebet Zone located higher in the above sediments strongly suggesting the same extensive underlying feeder source for the mineralizing fluids. Drill hole GD-22-25 on Pad J in the New Extension Target intersected multiple broad intervals of disseminated and vein/breccia hosted sulphide mineralization of up to 95.5 meters wide* containing pyrrhotite, pyrite and chalcopyrite in Hazelton volcanics. Drill hole GD-22-26 on Pad J in the New Extension Target intersected a broad zone containing 135 meters wide* of vein/breccia-hosted and disseminated sulphide mineralization in Hazelton volcanic rocks from bedrock (30 m) to the end of the hole (165 m) consisting of pyrrhotite (up to 3%), chalcopyrite (up to 1%) and pyrite (up to 5%). The hole terminated in sulphide mineralization and remains open. A photo accompanying this announcement is available: Click Here Drill hole GD-22-27 on Pad J in the New Extension Target intersected a broad zone containing 108 meters wide* of sulphide veining and brecciation from bedrock (57 m) to 165 m consisting of pyrrhotite (5% overall, locally massive cm-wide sections), pyrite (1%, locally up to 3%) and chalcopyrite (trace, disseminated) and remains open. A photo accompanying this announcement is available: Click Here The extensive mineralizing system has been confirmed over 1 km North-South along the Surebet Zone and 2 km East-West from Real Deal to the newly drilled Pad J located in the New Extension Target that remains open in ...