Business
GoldON Provides Update on Drilling at Slate Falls Gold-Silver Project in Northwestern Ontario
Drill core samples from nine holes are being submitted for analysis and results will be reported as received VICTORIA, BC / ACCESSWIRE / December 3, 2019 / Gold

About this update from Gold Finder Resources Ltd.
[{"type":"text","content":" Drill core samples from nine holes are being submitted for analysis and results will be reported as received VICTORIA, BC / ACCESSWIRE / December 3, 2019 / GoldON Resources Ltd. (TSX-V: GLD) (\"GoldON\" or the \"Company\") is pleased to report that a total of 1006.5 metres of core drilling has been completed through nine holes on its 100% owned Slate Falls Gold-Silver Project. This Phase I drill program tested targets at the Trail Zone, and the Sanderson Main, East and North zones (see drill hole location map), where summer sampling and mapping confirmed high-grade Au and Ag values (see news releases of June 25 and July 17, 2019). Drilling not only targeted the polymetallic quartz veins but also the shear zones hosting the high-grade veins as little historical sampling was completed on the host-rock both in previous drilling and trenching programs (see news release of November 5, 2019). Drilling concentrated on intersecting surface sample results approximately 50 metres vertically below while allowing for possible additional parallel shear zones in the footwall and hanging wall within the Slate Falls Deformation Zone hosting a D2 anticlinal fold axis. All holes hit mineralized shear zones at target depth, as well as parallel mineralized shear zones in addition to mineralized and altered feldspar porphyry. Drill hole statistics are presented below in Table 1 and drill target descriptions are as follows: Hole SF-19-01 was drilled at the Trail Zone to undercut surface sample # 251119 that returned assays of 331.76 g/t Au and 3,025 g/t Ag. Hole SF-19-02 was drilled at the Trail Zone to undercut surface sample # 251123 that returned assays of 32.95 g/t Au and 542 g/t Ag. Hole SF-19-03 was drilled at the Sanderson Main Zone to undercut surface sample # 251132 that returned assays of 3.23 g/t Au and 314 g/t Ag. Hole SF-19-04 was drilled at the Sanderson Main Zone to undercut surface sample # 251150 that returned assays of 17.09 g/t Au and 1,535 g/t Ag. Hole SF-19-05 was drilled at the Sanderson Main Zone to undercut surface sample # 251156 that returned assays of 5.8 g/t Au and 155 g/t Ag. Hole SF-19-06 was drilled at the Sanderson East Zone to undercut surface sample # 251178 that returned assays of 10.14 g/t Au and 123 g/t Ag. Hole SF-19-07 was drilled at the Sanderson North Zone to undercut surface sample # 251171 that returned ass...