Business
Goldshore Intersects 20.55m of 2.58 g/t Au Down Dip on the Southwest Zone: Extends Mineralization 150 Meters Below the Conceptual Open Pit Resource
Vancouver, British Columbia--(Newsfile Corp. - February 20, 2025) - Goldshore Resources Inc. (TS...

About this update from Gold X2 Mining Inc.
[{"type":"text","content":"Goldshore Intersects 20.55m of 2.58 g/t Au Down Dip on the Southwest Zone: Extends Mineralization 150 Meters Below the Conceptual Open Pit ResourceVancouver, British Columbia--(Newsfile Corp. - February 20, 2025) - Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) (\"Goldshore\" or the \"Company\"), is pleased to announce its latest assay results from its ongoing 15,000 meter drill program at the Moss Gold Project in Northwest Ontario, Canada (the \"Moss Gold Project\"). The primary goals of the winter drill program are to add to the current resource model by extending mineralization from depth into the top 100-200 meters from surface within the conceptual open pit and to demonstrate the potential for resource growth outside of the current mineral resource estimate. Michael Henrichsen, CEO of Goldshore, commented, \"We are pleased with the latest batch of drill results which clearly demonstrate the potential for resource expansion at higher grades in the southwest area of the Moss deposit. These results are exactly what we were anticipating to drive growth and demonstrate the true potential of the deposit moving forward. We look forward to sharing additional results from the winter drill program and regional exploration program in the coming weeks and months.\"HighlightsResults from hole MMD-24-139 extended gold mineralization with increased grades 150 meters below the conceptual open pit resource at the southwest end of the Moss deposit with intercepts of: 20.55m of 2.58 g/t Au from 458.15m, including14.7m of 3.52 g/t Au from 464.0mHole MMD-24-139 also confirmed mineralized shears on the southeast flank of the Southwest Zone extending known mineralization toward surface and encountering new mineralized shear zones with intercepts of: 7.8m of 1.03 g/t Au from 221.1m,2.4m of 1.44 g/t Au from 251.6m,5.5m of 1.89 g/t Au from 302.5m, including0.6m of 15.8 g/t Au from 307.4m7.65m of 1.41 g/t Au from 318.35m, and3.0m of 1.47 g/t Au from 338.0mHoles MMD-24-135, MMD-24-138, and MMD-24-139 also extended numerous mineralized shears toward surface in the Southwest Zone with intercepts of: 20.0m of 0.89 g/t Au from 81.0m in MMD-24-135, including3.85m of 2.86 g/t Au from 87.0m, and26.0m of 0.61 g/t Au from 107.0m, including5.7m of 1.17 g/t Au from 107.0m20.8m of 0.76 g/t Au from 108.8m in MMD-24-138, including2.05m of 3.33 g/t...