Business
Gold X2 Mining Intersects 60.7m of 1.51 g/t Au from 47.0m at QES as Part of the Moss Gold Project Infill Drilling Program
Vancouver, British Columbia--(Newsfile Corp. - May 13, 2026) - Gold X2 Mining Inc. (TSXV: AUXX) (OTCQB: GSHRF) (FSE: DF8) ("Gold X2" or the "Company") is

About this update from Gold X2 Mining Inc.
[{"type":"text","content":" Vancouver, British Columbia--(Newsfile Corp. - May 13, 2026) - Gold X2 Mining Inc. (TSXV: AUXX) (OTCQB: GSHRF) (FSE: DF8) (\"Gold X2\" or the \"Company\") is pleased to announce assays from its infill drilling program targeting the shallow QES Zone at the Moss Gold Project in Northwest Ontario, Canada (the \"Moss Gold Project\"). Michael Henrichsen, CEO and Director of Gold X2 commented \"These results from our infill drill program at the Moss Gold Deposit have displayed positive reconciliation with respect to the current MRE. We are very pleased with this trend as we continue to define new mineralized blocks through the intersection of unmodelled secondary shear zones, as well as convert mineral inventory that was too widely spaced to be included in the Inferred category in our current MRE.\" Highlights Ten holes were drilled through the upper portion of the QES Zone to upgrade near surface Inferred resources to the Indicated category within the current RPEEE (\"Reasonable Prospects for Eventual Economic Extraction\") open pit shell. These were drilled from winter-only access sites, advancing a critical portion of the infill program. Intercepts include: 27.0m of 1.70 g/t Au from 99.0m in MQD-26-336, including 6.0m of 3.81 g/t Au from 107.0m 20.0m of 1.24 g/t Au from 114.0m in MQD-26-338, including 9.0m of 2.26 g/t Au from 120.0m 14.0m of 1.81 g/t Au from 72.0m in MQD-26-339, including 6.0m of 3.61 g/t Au from 79.0m, and 34.0m of 1.14 g/t Au from 92.0m in MQD-26-339 48.0m of 0.95 g/t Au from 68.0m in MQD-26-340 20.0m of 1.03 g/t Au from 79.0m in MQD-26-341 60.3m of 0.65 g/t Au from 53.1m in MQD-26-342, including 13.0m of 1.1 g/t Au from 74.0m 60.7m of 1.51 g/t Au from 47.0m in MQD-26-343, including 22.2m of 2.42 g/t Au from 64.0m, and 12.0m of 2.19 g/t Au from 93.0m 22.0m of 1.71 g/t Au from 96.0m in MQD-26-344, including 2.0m of 15.1 g/t Au from 115.0m 43.55m of 0.65 g/t Au from 105.45m in MQD-26-346, including 4.0m of 2.47 g/t Au from 138.0m Technical Overview The results of the holes drilled across the core shears in the upper part of the QES Zone are illustrated in the following figures and tables. Figure 1 shows the location map of the drill holes reported in this release. Figure 2 provides a typical cross-section through drill holes MQD-26-343 and MQD-26-344. The results are summarized in Tables 1 to 3, which include sign...