Business

Gold X2 Announces Positive Reconciliation in Main Zone Grade Control Drilling with Intercepts Including 49.0m of 2.13 g/t Au

Vancouver, British Columbia--(Newsfile Corp. - January 30, 2026) - Gold X2 Mining Inc. (TSXV: AU...

articleGold X2 Mining Inc.January 30, 20263/company/gold-x2-mining-inc/news/gold-x2-announces-positive-reconciliation-in-main-zone-grade-control-drilling-with-intercepts-including-490m-of-213-gt-au
Gold X2 Announces Positive Reconciliation in Main Zone Grade Control Drilling with Intercepts Including 49.0m of 2.13 g/t Au

About this update from Gold X2 Mining Inc.

[{"type":"text","content":"Gold X2 Announces Positive Reconciliation in Main Zone Grade Control Drilling with Intercepts Including 49.0m of 2.13 g/t AuVancouver, British Columbia--(Newsfile Corp. - January 30, 2026) - Gold X2 Mining Inc. (TSXV: AUXX) (OTCQB: GSHRF) (FSE: DF8) (\"Gold X2\" or the \"Company\"), is pleased to announce the fourth and final batch of assay results from its Main Zone grade control drill program, with eleven shallow holes targeting the marginal to core shears within the Main Zone at the Moss Gold Project in Northwest Ontario, Canada (the \"Moss Gold Project\"). Michael Henrichsen, CEO of Gold X2 commented, \"We took the proactive step to derisk the resource model by conducting close-spaced drilling that emulates grade control drilling in a producing mine, to ensure we have a thorough understanding of the distribution of the gold mineralized shears at the mine scale. We have conducted a reconciliation exercise to understand how the resource model will perform in a potential mining scenario, and the results are very encouraging. Grade control drilling has identified additional, previously unrecognized secondary shear zones that have been assigned as waste in the current resource model. From this, we expect the upcoming infill drill program, with a tighter drill spacing, to grow the resource and significantly enhance the project's overall economics and mine plan.\"HighlightsAssay results from the final eleven holes in the Main Zone grade control drill program continue to strengthen confidence in the continuity of wide, near-surface, high-grade shear corridors defining the center of the Moss Main Zone. Select drill intercepts include:73.8m of 1.30 g/t Au from 7.0m in MMD-25-235, including32.0m of 1.29 g/t Au from 31.0m, and10.8m of 2.50 g/t Au from 69.0m61.25m of 1.53 g/t Au from 2.75m in MMD-25-253, including6m of 3.60 g/t Au from 23m, and8m of 4.90 g/t Au from 35m60.0m of 0.94 g/t Au from 118.0m in MMD-25-254, including12.4m of 2.13 g/t Au from 119.048.0m of 1.20 g/t Au from 118.0m in MMD-25-257, including6.0m of 4.64 g/t Au from 154.0m82.0m of 0.89 g/t Au from 22.0m in MMD-25-259, including7.0m of 3.13 g/t Au from 48.0m49.0m of 2.13 g/t Au from 43.0m in MMD-25-261, including15.0m of 3.43 g/t Au from 49.0m, and3.0m of 12.4 g/t Au from 71.0mReconciliation of all drill intercepts against those predicted by the current resource model ...

More updates from Gold X2 Mining Inc.