Business
TriMetals Mining Drills 80.8 Metres of 0.74 g/t Gold and 7.2 g/t Silver at South Jumbo Target, Gold Springs Project
VANCOUVER, BC--(Marketwired - September 08, 2017) - TriMetals Mining Inc. (TSX: TMI) (OTCQX: TMIAF), ("TMI" or the "Company"), is pleased to announce the first

About this update from Gold Springs Resource Corp.
[{"type":"text","content":"VANCOUVER, BC--(Marketwired - September 08, 2017) - TriMetals Mining Inc. (TSX: TMI) (OTCQX: TMIAF), (\"TMI\" or the \"Company\"), is pleased to announce the first 2017 drill results from the Gold Springs project located in Nevada and Utah. All the reported drilling is located on the Utah side of the project and includes the first 2017 hole from the Central Jumbo area located 1,000 metres south of the Jumbo resource and 600 metres northeast of the South Jumbo resource (Etna). Results from the first hole (SS-17-001) drilled in this area includes 21.3 metres @ 1.53 g/t Au and 2.5 g/t Ag. In addition, TMI reports results received to date from the South Jumbo target in the historic Etna Mine area. Highlights from this drilling include 80.8 metres at 0.74 g/t Au and 7.2 g/t Ag in hole E-17-005 and 83.8 metres at 0.64 g/t Au and 6.5 g/t Ag in hole E-17-003. Hole From (m) To (m) Thickness (m) Gold (g/t) Silver (g/t) AuEq (g/t) SS-17-001 135.6 157.0 21.3 1.53 2.5 1.57 E-17-003 94.5 178.3 83.8 0.64 6.5 0.75 Inc. 140.2 161.5 21.3 1.09 6.5 1.20 E-17-005 4.6 85.3 80.8 0.74 7.2 0.86 Inc. 4.6 56.4 51.8 0. 97 10.0 1.13 and 41.1 56.4 15.2 2.77 26.7 3.20 * Gold Equivalent (\"AuEq\") calculated using a 61.9 gold to silver ratio and assumes 100% metallurgical recoveries. True width is approximately 80-90% of Thickness. - Ralph Fitch, President and CEO of the Company stated, \"The results from the first holes of the 2017 drill program continue to expand the footprint of the mineralization within the Jumbo Trend confirming the expansion potential. The first 2017 hole in Central Jumbo (SS 17-001) starts to join our two Jumbo resource blocks, one in the north and one in the south together. Drilling is clearly both outlining and filling in the potential of this 5.5 km long structural trend. With less than 20% of this target drilled and less than 15% of project wide targets drilled we continue to believe in the substantial potential of the Gold Springs Project.\" Follow this link for maps and sections showing the location of these results: http://www.trimetalsminin...