Business
Global Energy Metals Project Development Manager Interviewed by Proactive; Provides Details on Planned Inaugural Drill Program at Lovelock Cobalt Nickel Copper Project in Nevada
(TheNewswire) Vancouver, BC - TheNewswire - September 30, 2021 - ...

About this update from Global Energy Metals Corp
[{"type":"text","content":"Global Energy Metals Project Development Manager Interviewed by Proactive; Provides Details on Planned Inaugural Drill Program at Lovelock Cobalt Nickel Copper Project in Nevada\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n Vancouver, BC - TheNewswire - September 30, 2021 -\n \n \n \n \n Global\nEnergy Metals Corporation\n \n \n \n \n \n (\n \n \n \n \n \n TSXV:GEMC\n \n \n \n \n \n )\n \n \n \n \n |\n \n \n \n \n (\n \n \n \n \n \n OTC:GBLEF\n \n \n \n \n \n )\n \n \n \n \n |\n \n \n \n \n (\n \n \n \n \n \n FSE:5GE1\n \n \n \n \n \n )\n \n \n \n \n (“Global Energy Metals”, the “Company” and/or\n“GEMC\n \n \n \n \n ”),\n \n \n \n \n a company involved\nin investment exposure to the battery metals supply chain, is pleased\nto report that\n \n \n \n \n \n Project Development\nManager, Timothy Strong, joined Steve Darling from\nProactive\n \n \n \n \n \n to share\nnews that the Company has secured O’Keefe Drilling, a drilling\ncontractor based in Butte, Montana, to complete up to 1,000 metres of\nreverse circulation drilling at the Lovelock Cobalt-Nickel-Copper\nproject in Nevada, USA.\n \n \n \n \n \n \n Strong explains to Proactive host, Steve\nDarling, that the drilling will focus on making new\ncopper-nickel-cobalt discoveries along newly defined conductors at\nLovelock which were identified from exploration fieldwork, surface and\nunderground mapping, as well as geophysics studies.\n \n \n \n \n \n \n News Release Linked\nBelow:\n \n \n \n \n \n \n September 29, 2021:\n \n \n \n \n \n Global Energy Metals Secures Drill Contractor and Prepares to\nMobilize for First-Ever Drill Program at the Lovelock\nCobalt-Nickel-Copper Project in Nevada\n \n \n \n \n \n \n The Company will be providing shareholders and\ninterested parties updates on the drilling activities at Lovelock as\nwell as on other corporate activities including developments with the\nnewly entered into\n \n \n \n \n collaboration with\nAmerican Battery Technology Company\n \n \n \n \n ,\nongoing\n \n \n \n \n exploration and studies\nbeing completed at its Millennium Cobalt-Copper-Gold\nproject\n \n \n \n \n in Queensland, Australia\nthrough work being done by Metal Bank Limited,\n \n \n \n \n Phase 2 work program at\nthe Monument Peak project\n \n \n \n \n in Idaho,\nUSA and further monetization of project ho...