Business
Bam Bam Resources Announces Copper, Silver, and Gold from Soil Geochemistry Expands Targets at Majuba Hill Porphyry Copper Project in Nevada
Vancouver, British Columbia--(Newsfile Corp. - October 14, 2021) - Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company")

About this update from Copper One Resources Corp.
[{"type":"text","content":" Vancouver, British Columbia--(Newsfile Corp. - October 14, 2021) - Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) (\"Bam Bam\" or the \"Company\") is pleased to report that recent results from the 2021 soil sampling program are extremely encouraging. 997 soil geochemical samples were collected in 2021 to extend existing copper, silver, and gold anomalies. Two very significant zones of copper/silver/gold were identified at the DeSoto Copper Oxide Target and the newly identified Copper-Gold Target. Figure 1 A very large, multi-point copper/silver anomaly at the DeSoto Oxide Target was extended an additional 274 meters (900 ft) northward. The DeSoto anomalous copper soil zone is outlined using a 100 ppm copper value threshold (see map). The new Copper-Gold Target Zone is over 1,600 meters (5,249 ft) across. Very limited historic underground workings at the Last Chance Mine on the southwest edge of the Target area produced silver, lead, and zinc. Surface rock chip samples from the Copper-Gold Target include: Table 1 Core drilling is planned for the copper-gold target in late October. The Covered/Exotic(?) Copper Target is a completely new target zone emerging from the data. Geologic mapping during 2021 has identified ferricrete zones with iron-oxide cemented colluvial gravels. These zones occur adjacent to topographic ridges and drainages that appear to confine weakly anomalous Cu, Zn, and Fe. Additional surface sampling is planned prior to drill testing. Most of this target is located on private land wholly controlled by Bam Bam with a small portion located on Bam Bam's unpatented lode mining claims. David Greenway, President and CEO, commented: \"While the step-out and in-fill drilling continues on our Majuba Known Copper Oxide Zone, it is encouraging for the surrounding targets to continue to get larger. During these economic times when new, large copper deposits are rare, I am very pleased to have a project like Majuba expanding so quickly.\" Quality Assurance/Quality Control (\"QA/QC\") Measures, Chain of Custody The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytica...