Business
Musk Metals Completes Airborne Survey at Its 100% Owned Allison Lake East Lithium Claims
VANCOUVER, BC / ACCESSWIRE / June 27, 2022 / Musk Metals Corp. ("Musk Metals") ("Musk" or the "Company") (CSE:MUSK)(OTC PINK:EMSKF)(FSE:1I30) is pleased to anno

About this update from Germanium Mining Corp.
[{"type":"text","content":" VANCOUVER, BC / ACCESSWIRE / June 27, 2022 / Musk Metals Corp. (\"Musk Metals\") (\"Musk\" or the \"Company\") (CSE:MUSK)(OTC PINK:EMSKF)(FSE:1I30) is pleased to announce it has successfully completed a high-resolution heliborne magnetic survey on its 100% owned Allison Lake East Lithium claims, conducted by Prospectair Geosurveys Inc. (\"Prospectair\"). These highly prospective claims are located in northwestern Ontario and situated within the recently mapped Allison Lake Batholith LCT Goldilocks zone that is a 5 km wide corridor containing spodumene-bearing pegmatites, spessartine-bearing pegmatites, rare-metal earth occurrences. Preliminary results show the TMI (Total Magnetic Intensity) signal is dominated by a strong regional gradient increasing towards the north and east. Musk's geological team will analyze the response at known occurrences of pegmatite dykes and follow similar patterns further away to increases chances of additional discoveries. These preliminary results will be used to establish a follow-up field work program with final interpretation of the airborne data available in approximately four weeks. Figure 1. Preliminary FVD and TMI images from Musk's airborne survey results Musk Metals is planning a two-phase exploration work program including an airborne survey, data compilation, geological mapping, trenching and sampling in Phase 1, followed by diamond drilling and metallurgical testing in Phase 2. The completed airborne survey is part of the Phase 1 exploration program and included traverse lines oriented N015 to properly map the dominant magnetic/geological strike, and with a 50m line spacing. Control lines were flown perpendicular to traverse lines and at a 500m line spacing with a total survey distance of 205 l-km. The closely spaced flight lines and low flying high resolution magnetic survey completed by Musk will vector future exploration efforts in these highly prospective areas. Musk's third lithium project, the Allison Lake East claims span over 1,500 hectares in close proximity to multiple mapped pegmatites, situated 45 km northwest of the McCombe Lithium Deposit with an unclassified and non-compliant resource of 2.08 Mt averaging 1.3% Li2O (MDI 52J13NE00004). The McCombe Lithium Deposit has recently been optioned by Green Technology Metals (ASX:GT1) as part of their Root-Seymour lithium asset wh...