Business
92 Resources Corp. Finalizes Its Exploration Plans for the 2017 Summer/Fall Field Program at Its Hidden Lake Lithium Project
92 Resources Corp. Finalizes Its Exploration Plans for the 2017 Summer/Fall Field...

About this update from Germanium Mining Corp.
[{"type":"text","content":"92 Resources Corp. Finalizes Its Exploration Plans for the 2017 Summer/Fall Field Program at Its Hidden Lake Lithium Project \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t 92 Resources Corp. Finalizes Its Exploration Plans for the 2017 Summer/Fall Field Program at Its Hidden Lake Lithium Project\n Vancouver, BC (FSCwire) - 92 Resources Corp. (the “Company”) (TSX.V: NTY) (FSE: R9G2) (OTCQB: RGDCF) is pleased to provide an exploration and development update for the Company’s wholly owned Hidden Lake Lithium Project (the “Project” or “Property”), Northwest Territories, Canada. The Property is situated within the central parts of the Yellowknife Lithium Pegmatite Belt along Highway 4, approximately 40 km east of Yellowknife. \n\n \n\nThe Company is in the final stages of planning for the summer/fall field program at its Hidden Lake Project, with crews set to mobilize to site shortly. A significant portion of the program will be fu...