Business

Generation Mining Announces Feasibility Study Report Update for the Marathon Copper-Palladium Project

Highlights: Robust Base Case economics 1 : An after-tax NPV 6% of $1.07 billi...

articleGeneration Mining Ltd.March 27, 20253/company/generation-mining/news/generation-mining-announces-feasibility-study-report-update-for-the-marathon-copper-palladium-project
Generation Mining Announces Feasibility Study Report Update for the Marathon Copper-Palladium Project

About this update from Generation Mining Ltd.

[{"type":"text","content":"Generation Mining Announces Feasibility Study Report Update for the Marathon Copper-Palladium Project\n\n\n .bwalignc { text-align: center; list-style-position: inside }\n.bwalignl { text-align: left }\n.bwblockalignc { margin-left: auto; margin-right: auto }\n.bwblockalignl { margin-left: 0px; margin-right: auto }\n.bwcellpmargin { margin-bottom: 0px; margin-top: 0px }\n.bwleftsingle { border-left: solid black 1pt }\n.bwlistdisc { list-style-type: disc }\n.bwpadb3 { padding-bottom: 4px }\n.bwpadl0 { padding-left: 0px }\n.bwpadl1 { padding-left: 5px }\n.bwpadr0 { padding-right: 0px }\n.bwrightsingle { border-right: solid black 1pt }\n.bwrowaltcolor0 { background-color: #cceeff }\n.bwsinglebottom { border-bottom: solid black 1pt }\n.bwtablemarginb { margin-bottom: 10px }\n.bwtopsingle { border-top: solid black 1pt }\n.bwvertalignb { vertical-align: bottom }\n.bwvertalignm { vertical-align: middle }\n.bwvertalignt { vertical-align: top }\n.bwwidth10 { width: 10% }\n.bwwidth100 { width: 100% }\n.bwwidth12 { width: 12% }\n.bwwidth13 { width: 13% }\n.bwwidth18 { width: 18% }\n.bwwidth25 { width: 25% }\n.bwwidth26 { width: 26% }\n.bwwidth28 { width: 28% }\n.bwwidth35 { width: 35% }\n.bwwidth46 { width: 46% }\n.bwwidth50 { width: 50% }\n.bwwidth64 { width: 64% }\n.bwwidth75 { width: 75% }\n.bwwidth8 { width: 8% }\n \n\n\n\n\n Highlights:\n \n\n\n\n\n Robust Base Case economics\n \n\n 1\n \n : An after-tax NPV\n \n 6%\n \n of $1.07 billion, IRR of 28% and 1.9 year payback period based on the 3-yr trailing average metal prices at the effective date\n \n 2\n \n\n\n\n Strong critical mineral production during pre-production and the first three years of commercial operation:\n \n 151 Mlbs of payable copper\n \n ,\n \n 720 koz of payable palladium and 156 koz of platinum\n \n\n\n Initial Capital:\n \n C$992 million\n \n 3\n \n\n\n\n Attractive AISC\n \n :\n \n\n Life of mine (“LOM”) all-in sustaining costs (“AISC”) of US$2.05/CuEq lb\n \n\n or US$781/PdEq oz\n \n 3\n \n\n\n\n At recent long-term consensus prices\n \n\n 2\n \n\n :\n \n An after-tax NPV\n \n 6%\n \n of $876 million, IRR of 24% and 2.2 year payback period, with 41% of payable metal revenues attributable to copper and 41% attributable to palladium\n \n\n\n At recent spot prices\n \n\n 2\n \n\n :\n \n\n\n An after-tax NPV\n \n 6%\n \n of $749 million, ...

More updates from Generation Mining Ltd.