Business
Geiger Extends Shallow Uranium Mineralization at ACKIO, Confirms Continuity at Hook Project, Saskatchewan
Key Highlights Intersected a shallow 10-metre mineralized interval with higher-intensity zone ...

About this update from Geiger Energy Corporation
[{"type":"text","content":"Geiger Extends Shallow Uranium Mineralization at ACKIO, Confirms Continuity at Hook Project, SaskatchewanKey HighlightsIntersected a shallow 10-metre mineralized interval with higher-intensity zone beginning at 52 metres downholeContinuity confirmed with mineralization connecting Pods 1 and 7Radiometric readings of up to 1,000 cps intersected in both drill holesMineralization remains open along strike, supporting further expansion potentialToronto, Ontario--(Newsfile Corp. - March 19, 2026) - Geiger Energy Corp. (TSXV: BEEP) (OTCQB: BSENF) (\"Geiger\") or the (\"Company\") reports results from the first two drill holes of its 2026 winter program at the ACKIO prospect on its 100% owned Hook Project in the Athabasca Basin, Saskatchewan (Figure 1, Figure 2).\"ACKIO stands out because of its shallow nature. Uranium mineralization beginning this close to surface is uncommon, particularly in the Athabasca Basin, and it enhances the overall attractiveness of the discovery as we continue to expand it. With mineralization open in multiple directions, we see meaningful opportunity for further growth. These results confirm continuity across multiple pods and support our interpretation of a broader mineralized system at ACKIO. The next phase of drilling will step south to test for additional zones along the broader fertile trend,\" said Rebecca Hunter President & CEO of Geiger.Early drilling on ACKIO has extended mineralization in both Pod 1 and Pod 7, supporting continuity within the structurally controlled system. Both holes intersected mineralization within discrete fault and alteration zones with radiometric readings of up to 1,000 counts per second (cps). One hole returned a continuous 10-metre mineralized interval, beginning at 52 metres downhole which included a high-intensity zone at approximately 57 metres. ACKIO MineralizationThe 2026 program targeted mineralization at Pods 1 and 7, which are presentwithin structurally controlled zones marked by strong brecciation and alteration, including hematite, chlorite and sulphides, hosted in variable calc-silicate and calc-pelite rocks. Localized desilicification and albitization are observed near higher-grade intervals and appear to be associated with stronger radiometric responses.In hole AK26-145, mineralization was intersected from 52 to 62 metres, with peak radiometric r...