Business
Baselode's Latest Webinar Provides Details for Diamond Drilling Target Areas on the Hook Uranium Project
Baselode's Latest Webinar Provides Details for Diamond Drilling Target Areas on the Hook ...

About this update from Geiger Energy Corporation
[{"type":"text","content":"\n \n \n \n Baselode's Latest Webinar Provides Details for Diamond Drilling Target Areas on the Hook Uranium Project\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n TORONTO\n \n ,\n \n Aug. 17, 2021\n \n /CNW/ - Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) (\"\n \n Baselode\n \n \" or the \"\n \n Company\n \n \") is pleased to present its latest webinar '\n \n Hook: Defining Drill Target Areas'.\n \n This webinar details the exploration potential of the planned drill target areas of the Company's 100% owned Hook uranium project (\"\n \n Hook\n \n \"), including:\n \n \n \n Beckett drill target area showcasing gravity and magnetic characteristics similar with other\n \n Athabasca\n \n basement-hosted high-grade uranium deposits,\n \n \n \n \n South Geikie drill target as an exciting radiometric anomalous area with interesting magnetic and gravity anomalies to follow-up,\n \n \n \n \n Detailed interpretations of the airborne magnetic and gravity geophysical surveys to identify lithological corridors and structures of interest for uranium exploration,\n \n \n \n \n The results of the recently completed airborne radiometric survey highlighting eight anomalous areas requiring groundtruthing.\n \n \n \n \n VIEW BASELODE'S WEBINAR:\n \n \n \n VIDEO 5 – HOOK: DEFINING DRILL TARGET AREAS\n \n \n \n \n Planned Drill Program for Hook\n \n \n Baselode is anticipating a total of 10 to 15 drill holes for a total of 2,500 metres with each drill hole ranging from 150 to 250 metres drill hole depth.  The drill program is planned with helicopter support to achieve broader target area coverage and to lessen any ground-induced environmental impacts within the project area.  A field crew is onsite and has prepared the core shack and the first drill pad locations. The drill program's logistics have been organized and are ready to begin the drill program.  The drill contractor is scheduled to be onsite within the next 10 days.\n \n \n \n About Baselode Energy Corp.\n \n \n Baselode cur...