Business
Galway Metals Discovers 3 New Veins in Gap: 19.5 g/t Au over 4.0m, 75.9 g/t Au over 1.1m and 10.0 g/t Au over 3.0m, plus Intersects Known Veins with 3.5 g/t Au over 40.0m and 9.5 g/t Au over 6.5m
TORONTO, ON / ACCESSWIRE / January 25, 2021 / Galway Metals Inc. (TSXV:GWM) (the "Company" o...

About this update from Galway Metals, Inc.
[{"type":"text","content":"Galway Metals Discovers 3 New Veins in Gap: 19.5 g/t Au over 4.0m, 75.9 g/t Au over 1.1m and 10.0 g/t Au over 3.0m, plus Intersects Known Veins with 3.5 g/t Au over 40.0m and 9.5 g/t Au over 6.5mTORONTO, ON / ACCESSWIRE / January 25, 2021 / Galway Metals Inc. (TSXV:GWM) (the \"Company\" or \"Galway\") is pleased to report full and partial assay results from 8 new holes plus results from 2 holes that had some assays pending in the 650 metre gap between the Richard and George Murphy Zones (GMZ) at the Company's Clarence Stream project in southwest New Brunswick, Canada (Figure 1 and Figure 2). The latest results are highlighted by likely extensions to the east of previously identified veins and new veins to the north, which are denoted as (new 1, 2 or 3):Hole 128 had pending assays added to the previously-released results with the full intersect now returning 3.5 grams per tonne (g/t) Au over 40.0 metres (m), including the previously-released 5.3 g/t Au over 25.5m, which includes 54.6 g/t Au over 0.5m, 20.9 g/t Au over 2.5m, and 13.7 g/t Au over 2.4m, starting at a vertical depth of 190m below surface. It is 92m below hole 125, but is now interpreted to be a different vein. Hole 125 intersected 17.0 g/t Au over 5.5m, including 163.0 g/t Au over 0.5m with VG. Hole 128 intersected three additional veins: 17.9 g/t Au over 2.0m (new 2), including 33.4 g/t Au over 0.5m, plus 1.1 g/t Au over 8.4m (new 1), plus previously reported 0.5 g/t Au over 13.0m, starting at vertical depths of 375m, 281m and 63m, respectively.Hole 133 intersected three veins: 9.5 g/t Au over 6.5m, including 27.2 g/t Au over 1.0m, plus 2.2 g/t Au over 15.5m, including 30.2 g/t Au over 0.7m, plus 10.0 g/t Au over 3.0m (new 2), including 18.7 g/t Au over 1.0m, starting at vertical depths of 148m, 172m, and 319m, respectively. The 3.5 g/t Au over 40.0m from hole 128 is thought to be the same zone as the 9.5 g/t Au over 6.5m, and 2.2 g/t Au over 15.5m, with 72m and 47m between them. Assays are pending for 17.0m of the 18.5m interval between the 9.5 g/t Au over 6.5m and 2.2 g/t Au over 15.5m intersects.Hole 130 intersected four veins: 75.9 g/t Au over 1.1m (new 2), plus 1.3 g/t Au over 25.0m (new 3) (included to show the scope of mineralization in this new vein; used the 0.42 lower cut-off for pit-constrained mineralization but the depth likely precludes its inclusion i...