Business

Wildcat Completes Jeep Drill Program - Achieves Positive Results

Wildcat Completes Jeep Drill Program - Achieves Positive Results.

articleFuse Battery Metals IncJuly 12, 20075/company/fuse-cobalt-inc/news/wildcat-completes-jeep-drill-program-achieves-positive-results
Wildcat Completes Jeep Drill Program - Achieves Positive Results

About this update from Fuse Battery Metals Inc

[{"type":"text","content":"\n\n\n\nWEL - TSXV\n\n\nCALGARY, July 12 /CNW/ - Wildcat Exploration Ltd. (WEL: TSX-V) announces\nthe results of the final five of thirty-six drill holes completed on the Jeep\nProject in the Rice Lake greenstone belt in southeastern Manitoba.\n\n\nThe 8,235 meter drill program achieved the following results:\n\n - successfully tested and further outlined the northwest and\n southeast prolongation of the No. 1 vein system of the former\n producing Jeep Gold Mine, bringing the potential total strike\n length to 1.1 kilometers\n - confirmed the presence, at depth, of elevated nickel-copper-\n platinum group elements ("Ni-Cu-PGE") associated with a magnetic\n anomaly 300 meters southeast of the Jeep Mine shaft area (see\n News Release April 03, 2007)\n - extended the depth of the No. 3 vein system of the Jeep Mine to\n approximately 40 meters below the historic mine workings (see\n News Release June 22, 2007).\n\n\nThe drill results announced today cover the final stage of the 2006-2007\ndrill program with drill holes JP-07-32, through to JP-07-36. This stage\ntargeted an extensive MMI (Mobile Metal Ion) soil arsenic anomaly, 450 meters\nlong by 200 meters wide, in an area 750 meters southeast of the Jeep mine\nshaft and along trend of the No. 1 vein.\n\n\nHoles JP-07-32 to -34 were drilled 700 to 800 meters southeast of the\nJeep Mine shaft drilled with a 50 meter separation along strike.\n\n\nDrill hole JP-07-32 was collared 800 meters southeast of the Jeep Mine\nshaft and intersected two weakly mineralized veins. From 183.5 to 184.5\nmeters, 0.38 gpt gold was intersected over 1.0 meter and from 205.75 to\n206.75 meters 0.16 gpt gold was intersected over 1.0 meter. Hole JP-07-33 was\ndrilled 50 meters northwest of JP-07-32 and intersected 1.44 gpt gold over\n1.0 meter from 214.7 to 215.7 meters. No significant results were obtained\nfrom hole JP-07-34.\n\n\nThese intersections may represent the southeastern-most prolongation of\nthe No. 1 vein system southeast of the Jeep Mine shaft. The vein system also\nextends further to the northwest of the Jeep Mine shaft (see press release\ndated June 22, 2007) for a potential total strike length of 1.1 kilometers.\nThis extensive structure invites further testing.\n\n\nHoles JP-07-35 and -36 were drilled to test for the proposed southeastern\nextension of the Ni-Cu-PGE occurrence...

More updates from Fuse Battery Metals Inc