Business
LiCo Energy Metals - Intersects 0.77% Cobalt over 3.40 m and 1.50% over 0.40 m at the Teledyne Cobalt Property
(via TheNewswire) March 7 , 2018 / TheNewswire / Vancouver, British Columbia; - LiC...

About this update from Fuse Battery Metals Inc
[{"type":"text","content":"LiCo Energy Metals - Intersects 0.77% Cobalt over 3.40 m and 1.50% over 0.40 m at the Teledyne Cobalt Property(via TheNewswire)\n\n \nMarch 7, 2018 / TheNewswire / Vancouver, British Columbia; - LiCo Energy Metals Inc. (\"the Company\" or LiCo\") TSX-V: LIC, OTCQB: WCTXF is pleased to report assay results for drill holes TE17-06 through to TE17-11 completed on the Teledyne Cobalt Property, located 6 km northeast of Cobalt, Ontario. The current drill program was designed to confirm and extend the existing known mineralization along strike and up and down dip.\n\n\n \n\"LiCo is pleased to report the final assay results for the Phase 1 diamond drill program completed at the Teledyne Cobalt Property. Drill hole TE17-08 intersected multiple zones of cobalt mineralization over a core interval of just over 19 m\" says Tim Fernback, President & CEO of LiCo. \n\n\n \nA summary of the most significant results of the recent drill core assays are:\n\n\n \n\n\n- TE17-07 0.50% Co over 2.10 m from 127.60 to 129.70 m, including 1.50% over 0.40 cm from 128.20 to 128.60 m.\n\n\n\n- TE17-08 0.77% Co over 3.40 m from 169.50 to 172.90 m, including 1.17% Co over 2.00 m from 169.50 to 171.50 m.\n\n\n\n- TE17-08 0.59% Co over 1.20 m from 174.00 to 175.20 m. \n\n\n\n- TE17-08 0.62% Co over 0.60 m from 178.60 to 179.20 m.\n\n\n\n- TE17-11 0.54% Co over 2.00 m from 130.00 to 132.00 m, including 1.07% Co over 0.50 m from 130.00 to 130.50 m.\n\n\n\n\n \nOn the Teledyne Cobalt Property, the Company completed a total of 11 diamond drill holes totaling 2,200 m in the fall of 2017. \n\n\n \nThe results and drill hole collar information for diamond drill holes TE17-06 to TE17-11 are summarized in Tables 1 & 2 below. \n\n \n \nTable 1: Summary of Diamond Drill Results\n\n \n\nDDH\n\n\n\n\nFrom (m)\n\n\n\n\nTo\n\n\n\n(m)\n\n\n\n\nCore Length (m)\n\n\n\n\nCo\n\n\n\n(%)\n\n\n\n\nAg (ppm)\n\n\n\n\nCu (ppm)\n\n\n\n\nZn (ppm)\n\n\n\n\nPb (ppm)\n\n\n\n\nTE17-06\n\n\n\n\n164.00\n\n\n\n\n165.00\n\n\n\n\n1.00\n\n\n\n\n0.14\n\n\n\n\n0.7\n\n\n\n\n4\n\n\n\n\n33\n\n\n\n\n6\n\n\n\n\nTE17-07\n\n\n\n\n127.60\n\n\n\n\n129.70\n\n\n\n\n2.10\n\n\n\n\n0.50\n\n\n\n\n2.3\n\n\n\n\n130\n\n\n\n\n157\n\n\n\n\n32\n\n\n\n\nincl.\n\n\n\n\n128.20\n\n\n\n\n128.60\n\n\n\n\n0.40\n\n\n\n\n1.50\n\n\n\n\n6.6\n\n\n\n\n206\n\n\n\n\n84\n\n\n\n\n46\n\n\n\n\nTE17-08\n\n\n\n\n160.00\n\n\n\n\n160.50...