Business

Fuse Battery Metals intercepted 7.75% Co and 5.44% Ni over 0.42m at Glencore-Bucke

(TheNewswire) Coquitlam, BC - TheNewswire - September 5, 2023 - Fuse Battery Me...

articleFuse Battery Metals IncSeptember 5, 20234/company/fuse-cobalt-inc/news/fuse-battery-metals-intercepted-775percent-co-and-544percent-ni-over-042m-at-glencore-bucke
Fuse Battery Metals intercepted 7.75% Co and 5.44% Ni over 0.42m at Glencore-Bucke

About this update from Fuse Battery Metals Inc

[{"type":"text","content":"Fuse Battery Metals intercepted 7.75% Co and 5.44% Ni over 0.42m at Glencore-Bucke\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n Coquitlam, BC -\n \n \n TheNewswire -\n \n \n September 5, 2023 -\n \n \n Fuse Battery Metals Inc.\n \n \n (“\n \n \n the\n \n \n Company\n \n \n ” or\n“\n \n \n Fuse\n \n \n ”)\n \n \n (TSXV:FUSE\n \n \n )\n \n \n (\n \n \n OTC:FUSEF\n \n \n )\n \n \n (\n \n \n FRA:43W3\n \n \n ) is pleased to announce the Company\nhas received assay results from the recently completed drill program\nat the Glencore Bucke Project located just outside Cobalt Ontario and\nnear the cobalt refinery of Electra Battery Metals Corporation\n(\n \n \n NASDAQ:ELBM\n \n \n ).\n \n \n \n \n “We are pleased with the drill results from GB22-55\nto GB22-58 as they suggest structures are continuing southward towards\nthe Teledyne property.  GB22-56 has 2% Cobalt, 0.95% Ni, 1.15 gpt Au\nand 24.81 gpt Ag over 1.53m. We are excited to continue to evaluate\nthe mineralization along trend at the Teledyne.” Comments Tim\nFernback, Fuse President & CEO.  “We are pleased that the holes\ntesting the extension of copper-cobalt zone have come back positive\nwith many intervals being over 5m core length.”\n \n \n \n \n The drill program was engineered to follow-up existing\nintercepts from the 2017-2018 drill programs in addition to testing\nthe First Priority Targets outlined in the geophysical report\ncompleted by Simcoe Geoscience in August 2022. The 2022 drill program\nhad a budget of CAD$500,000. The drill program completed 13 drill\nholes for a total of 1842 meters.\n \n \n \n \n Towards the North-West part of the property, five drill\nholes\n \n \n were planned to follow up on the areas\nunderneath T-18, GB17-21, GB18-36, and GB17-15 further down-dip of the\nexisting structures. They were designed to test the vein continuity,\nas well as test the continuation of the copper-rich sulphide zones\npreviously encountered.\n \n \n These include drill\nholes GB22-46, GB22-47. GB22-48, GB22-49, and GB22-50. The results\nfrom these drill holes are comparable to the intercepts encountered in\nprevious drill programs, and prove the mineralization continues\nfurther at depth in the Main Zone.\n \n \n \n \n The drill was then moved east and southward to test the\ngeophysical IP...

More updates from Fuse Battery Metals Inc