Business

70%+ gold and silver recoveries at Teck Hughes

Fulcrum Metals PLC has announced preliminary results from its Teck-Hughes mine tailings project, achieving over 70% gold and silver recoveries using cyanide-free technology, a significant increase from previous figures. The company is extending its leach testing program to assess final recoveries and the potential extraction of gallium and tellurium, with full phase 3 metallurgical results expected in Q1 2026. These positive preliminary recoveries, combined with the current gold price exceeding US$4,000 per ounce, could potentially lead to substantial increases in Fulcrum's previously estimated US$33 million NPV for the Teck-Hughes project. Disclaimer*

articleFulcrum Metals PlcDecember 2, 20255/company/fulcrum-metals-plc/news/70percent-gold-and-silver-recoveries-at-teck-hughes
70%+ gold and silver recoveries at Teck Hughes

About this update from Fulcrum Metals Plc

[{"type":"text","content":"\n\n \nTHIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF EU REGULATION 596/2014 (WHICH FORMS PART OF DOMESTIC UK LAW PURSUANT TO THE EUROPEAN UNION (WITHDRAWAL) ACT 2018) (\"UK MAR\").\n \nFulcrum Metals plc / EPIC: FMET / Market: AIM / Sector: Mining\n \n2 December 2025\n \nFulcrum Metals plc\n(\"Fulcrum\" or the \"Company\" or the \"Group\")\n \nFulcrum preliminary results achieve 70%+ cyanide-free gold and silver recoveries at Teck Hughes  \n \nFulcrum Metals plc (AIM:FMET), a company pioneering the use of  innovative cyanide-free technology to recover precious and critical metals from mine waste, is pleased to provide preliminary gold and silver recovery results and an update on the phase 3 detailed metallurgical work with Extrakt Process Solutions LLC (\"Extrakt\") at the Teck-Hughes mine tailings project at Kirkland Lake, Ontario.\n \nFurther to the announcement released by the Company on 17 September 2025, Fulcrum and Extrakt commenced phase 3 development work to optimise leach recovery, tailings dewatering, and pregnant solution recovery for integrating into Fulcrum's operations.\n \nPreliminary results achieved gold and silver recoveries of >70%, with the leach programme now extended to assess final recoveries and potential extraction of other metals such as gallium and tellurium. The final results from the phase 3 metallurgical testing, which optimises leach recoveries, reagent recycling, mass flow, dewatering, and upscaling parameters, are expected in Q1 2026.\n \nPhase 3 work update:\n \n·    Material 18% relative increase in gold leach recoveries from 59.4% to above 70%\n \n·    High silver leach recoveries above 70% (not previously tested)\n \n·    Leach testing programme extended to include final gold and silver recoveries as well as other metals such as gallium and tellurium\n \n·    The final results of the detailed metallurgical phase 3 work, which aims to further optimise recoveries, yield and process efficiencies is expected in Q1 2026\n \nResults of the phase 3 test work and the auger drilling programme underway will support a 43-101 compliant Mineral Resource Estimate (\"MRE\") leading into a Phase 4 Preliminary Feasibility Study (\"PFS\"...

More updates from Fulcrum Metals Plc