Business
Frontier Lithium Commences Technical Drilling On The PAK Lithium Project
Frontier Lithium Commences Technical Drilling On The PAK Lithium Project S...

About this update from Frontier Lithium Inc.
[{"type":"text","content":"Frontier Lithium Commences Technical Drilling On The PAK Lithium Project \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t Frontier Lithium Commences Technical Drilling On The PAK Lithium Project\n Sudbury, Ontario (FSCwire) - Frontier Lithium Inc. (TSX.V: FL)(the “Company”), is pleased to announce the commencement of a technical drilling program on its PAK Lithium Project, in the Red Lake mining district in Northwestern Ontario, Canada. \n\n \n\nThe drilling campaign is designed for the collection of data essential for the finalization of geo-technical and geo-mechanical parameters required for the pending pre-feasibility study (“PFS”). The drilling program will comprise of approximately 750 metres (“m”) of diamond drilling that will be used to test areas for potential site infrastructure, as well as determining optimum pit wall angles for a potential mining operation.\n\n \n\nIt is anticipated that the pending PFS will be complet...