Business
Happy Creek drills 14.8 metres of 4.0% W03 at the Fox tungsten property
(via Thenewswire.ca) November 19, 2012 -- Vancouver, British Columbia -- Happy Creek Minera...

About this update from Fox Tungsten Ltd.
[{"type":"text","content":"\nHappy Creek drills 14.8 metres of 4.0% W03 at the Fox tungsten property\n\n(via Thenewswire.ca)\n\n \nNovember 19, 2012 -- Vancouver, British Columbia -- Happy Creek Minerals Ltd. (TSX-V:HPY, the \"Company\") is pleased to announce final drill results from its 100% owned, 162 square kilometre Fox tungsten property. The Fox property is located approximately 75 kilometres northeast of 100 Mile House, British Columbia (B.C.), Canada. During 2012, 29 holes were completed. Previously released holes from the RC prospect have outlined a zone of continuous mineralization. The balance of 2012 drill results from the BN and BK prospect, and a summary are presented below.\n\n \n \nThe BN prospect is located one kilometre south of the RC prospect. New results include F12-27 with 4.10 metres of 1.78% W03 (tungsten trioxide) at surface, 14.8 metres of 4.0% W03 starting at 83.2 metres and 24.0 metres of 0.79% W03 starting at 136.0 metres. A 250 metre step-out to the west returned 2.1 metres of 0.52% W03 starting at 56.0 metres in F12-29. The BK prospect is located one kilometre to the north of the RC prospect, and F12-20 returned 5.0 metres of 0.68% W03 starting at 28.0 metres. Results indicate there are multiple (\"stacked\") mineralized zones, potentially economic grades in three areas over a two kilometre distance and 250 metre width, and all mineralized zones are open in extent.\n\n \n \nDavid Blann, President and Chief Executive Officer of Happy Creek states: \"F12-27 appears to be one of the best tungsten results globally in the past 30 years or more. All results from the property point toward large scale resource potential with good grade. We are very pleased to see the Fox continue to develop as a new top-tier tungsten discovery\".\n\n \n \nHighlights of Fox Property Tungsten Drill Results\n\n \n \n\n ------------------------------------------------------------\n |  |  |Hole |From |To |Interval|W03 |W03 |\n |----------------------------------------------------------|\n |Prospect|Hole |Angle|(m) |(m) |(m) |% |kg/tonne|\n |----------------------------------------------------------|\n |RC |F11-02 |-90 |5.7 |10.85|5.15 |0.91|9.1 |\n |----------------------------------------------------------|\n |RC |F11-07 |-55 |14.3 |19.0 |4.7 |1.02|10.0 |\n |----------------------------------------------------------|\n |RC |F11-08 |-90 |8.25 |...