Business
Fortuna Reports Silver Production of 437,123 ounces for First Quarter 2011
Apr. 26, 2011 (Canada NewsWire Group) -- VANCOUVER, April 26 /CNW/ - Fortuna Silver Mines In...

About this update from Fortuna Mining Corp.
[{"type":"text","content":"\n\n\n Apr. 26, 2011 (Canada NewsWire Group) -- \n\n#ReleaseContent TABLE\n{\n BORDER-COLLAPSE: collapse\n}\nTR.cnwUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTR.cnwDoubleUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTR.cnwBoldUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px solid\n}\nTD.cnwUnderlinedCell\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTD.cnwDoubleUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTD.cnwBoldUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px solid\n}\n#ReleaseContent TABLE.cnwBorderedTable TD\n{\n BORDER-RIGHT: black 1px solid;\n PADDING-RIGHT: 2px;\n BORDER-TOP: black 1px solid;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n BORDER-LEFT: black 1px solid;\n PADDING-TOP: 2px;\n BORDER-BOTTOM: black 1px solid;\n BORDER-COLLAPSE: collapse\n}\n#ReleaseContent TABLE TD\n{\n PADDING-RIGHT: 2px;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n PADDING-TOP: 2px\n}\n\n\n\n\nTRADING SYMBOL\nTSX: FVI\nLima Stock Exchange: FVI\n\n\n\n\[email protected]\nwww.FORTUNASILVER.com\n\n\n\n\nVANCOUVER, April 26 /CNW/ - Fortuna Silver Mines Inc. (TSX: FVI) (Lima Stock Exchange: FVI) is pleased to announce production figures for the first quarter of 2011\n from the Caylloma Mine located in Arequipa, Peru.  Fortuna's production\n guidance for 2011 is 2.4 million ounces of silver, 7,530 ounces of\n gold, 25.2 million pounds of zinc, 16.6 million pounds of lead and\n 760,000 pounds of copper.\n\n\nFirst Quarter Highlights\n\n\n\nSilver production of 437,123 ounces; 8.9% decrease over Q1 2010\n\n\nLead production of 5,045,582 pounds; 14.8% decrease over Q1 2010\n\n\nZinc production of 5,744,798 pounds; 16.4% decrease over Q1 2010\n\n\nCash cost per silver ounce, net of by-product credits, estimate of\n negative US$4.52\n\n\n\nThe drop in silver production for the quarter is explained by lower mill\n throughput, related to power outages as a result of unusual winter\n conditions, and to two percentage points lower than expected\n metallurgical recoveries associated with sourcing approximately 20% of\n production from mixed sulfide-oxide ore from level six of Animas vein.\n Management does not anticipate climatic conditions to continue\n affecting production into the second quarter.     \n\n\nCaylloma Mine Operating Highlights:\n\n\n\n\n \n\n\n \n\n\n \n\n\n&...