Business
Barsele Minerals: Expansion drill hole SKI18007 at the Skiråsen Zone intersects Five Mineralized Intervals, including 15.0 metres grading 3.74 g/t gold
At the Central Zone, near-surface infill hole CNT18009 cut 57.0 metres grading 1.60 g/t gold CNT18008, a near-surface infill hole, intersects 58.1 metres gradin

About this update from Goldsky Resources Corp.
[{"type":"text","content":" At the Central Zone, near-surface infill hole CNT18009 cut 57.0 metres grading 1.60 g/t gold CNT18008, a near-surface infill hole, intersects 58.1 metres grading 1.37 g/t gold. VANCOUVER, Nov. 14, 2018 /CNW/ - Barsele Minerals Corp. – (TSXV: BME) (\"Barsele\") is pleased to report an operational update for the ongoing exploration program within the Barsele Gold-VMS Project area in Västerbottens Län, northern Sweden (the \"Barsele Project\"). The exploration program is being operated by joint venture partner Agnico Eagle Mines Limited – (TSX, NYSE: AEM) (\"Agnico Eagle\"). Ownership in the Barsele Project is 55% Agnico Eagle and 45% Barsele. Agnico Eagle can earn an additional 15% in the Barsele Project through the completion of a pre-feasibility study. There is no cash outlay requirement by Barsele until a pre-feasibility study is completed. Three drills were operational during the month of August, 2018. As of the end of August, 27,346 metres of core has been collected from 66 completed holes, since drilling was re-started in early January. The main focus of this month's drilling has been on regional targets within the Risberget and Skirliden areas, as well as proximal and regional VMS targets. Seven drill holes are presented in this news release. At the Avan Zone, one expansion hole is documented, along with three infill and two expansion holes at the Central Zone and one expansion hole southwest from the Skiråsen Zone. Three regional exploration holes were completed at the Risberget Zone, with one ongoing at month end. At the Skirliden area, along the southeastern extension of Lake Skirträsket, three regional exploration holes were completed, including two covering VMS targets. Additionally, six regional VMS holes were completed in other sectors of the property. Base of till drill testing continued in August, with 663.5 metres probed in 75 holes. Regional surface till sampling was ongoing, with 340 samples collected. At the Central Zone, drill hole CNT18008 intersected two shallow gold-bearing zones, with the best intercept being 58.1 metres (estimated true thickness) grading 1.37 g/t gold, at a midpoint depth of 65 metres below surface. Hole CNT18009 cut 57.0 metres (estimated true thickness) grading 1.60 g/t gold at a midpoint depth of 65 metres below surface. Hole CNT18010 intersected three shallow gold-bearing zones;...