Business

First Atlantic Nickel Doubles RPM Zone Strike Length to 800 Meters at Pipestone XL Nickel Alloy Project with 491 Meter Awaruite (Ni3Fe) Intercept in Phase 2X Drilling

GRAND FALLS-WINDSOR, Newfoundland and Labrador, Sept. 25, 2025 (GLOBE NEWSWIRE) -- First Atlant...

articleFirst Atlantic Nickel & Cobalt Corp.September 25, 20255/company/first-atlantic-nickel-corp/news/first-atlantic-nickel-doubles-rpm-zone-strike-length-to-800-meters-at-pipestone-xl-nickel-alloy-project-with-491-meter-awaruite-ni3fe-intercept-in-phase-2x-drilling
First Atlantic Nickel Doubles RPM Zone Strike Length to 800 Meters at Pipestone XL Nickel Alloy Project with 491 Meter Awaruite (Ni3Fe) Intercept in Phase 2X Drilling

About this update from First Atlantic Nickel & Cobalt Corp.

[{"type":"text","content":"First Atlantic Nickel Doubles RPM Zone Strike Length to 800 Meters at Pipestone XL Nickel Alloy Project with 491 Meter Awaruite (Ni3Fe) Intercept in Phase 2X DrillingPhase 2X Drilling Achieves 800 Meter Strike Length with First Hole on Line S3 Confirming Continuity of Awaruite Mineralization\n\n\n\n GRAND FALLS-WINDSOR, Newfoundland and Labrador, Sept. 25, 2025 (GLOBE NEWSWIRE) --\n \n First Atlantic Nickel Corp. (TSXV: FAN) (OTCQB: FANCF) (FSE: P21) (\"First Atlantic\" or the \"Company\")\n \n is pleased to report that drill hole AN-25-08 intersected 491 meters of large grain, visibly disseminated awaruite (Ni3Fe) mineralization at the RPM Zone within its Pipestone XL Nickel Alloy Project (formerly named the Atlantic Nickel Project) in Newfoundland. This significant intersection on Line S3, is the first reported drill hole from this section and extends the RPM Zone strike length to 800 meters north-south, doubling the strike length drilled during Phase 1. AN-25-08 confirmed visibly disseminated awaruite throughout the length of the drill core, supporting the continuity of nickel-iron-cobalt alloy mineralization across the expanding RPM Zone footprint.\n \n\n Phase 2X drilling is expanding the RPM Zone at Pipestone XL with long intersections of visibly disseminated awaruite mineralization. Step-out drilling has now confirmed continuous awaruite mineralization across three drill sections (S1, S2, and S3), each spaced approximately 400 meters apart. RPM Zone awaruite nickel mineralization currently extends 800 meters along strike and remains open in all directions (see Figure 1).\n \n\n Samples from Phase 2X drill holes have been submitted for whole-rock assay analysis and Davis Tube Recovery (DTR) metallurgical testing to evaluate magnetically recoverable nickel (DTR nickel grade). To date, DTR testing from the RPM Zone has returned magnetic concentrate grades averaging 1.38% nickel and 1.67% chromium. These results correspond to an average DTR nickel grade of 0.12% with a mass pull of 9.08%. A summary of all drill results to date is presented in Table 1.\n \n\n\n HIGHLIGHTS:\n \n\n\n\n\n RPM Zone First Drill Hole on Line S3 Doubles Strike Length to 800 Meters:\n \n Drill hole AN-25-08 on Line S3 has successfully extended the RPM Zone up to 800 meters of continuous north-south strike length - a 2X increase from the original Phase...

More updates from First Atlantic Nickel & Cobalt Corp.