Business

FireFly set to capitalise on strong copper outlook with economic studies underway

Preliminary Economic Assessment on Green Bay Copper-Gold Project on track for completion in the June 2026 quarter, highlighting the value of the world-scale ResourceHIGHLIGHTS Total Green Bay Mineral Resource increased to 50.4Mt @ 2.0% Copper Equivalent (CuEq) in the Measured & Indicated (M&I) categories plus 29.3Mt @ 2.5% CuEq in the Inferred category: This was a 51% increase from the previous Mineral Resource Estimate (MRE) of October 2024Contained copper increased to 863kt M&I (+113%) plus 56

articleFirefly Metals LtdJanuary 29, 202634/company/firefly-metals-ltd/news/firefly-set-capitalise-strong-copper-002200472
FireFly set to capitalise on strong copper outlook with economic studies underway

About this update from Firefly Metals Ltd

[{"type":"image","alt":"FireFly Metals Limited","displaySize":"","headline":null,"caption":"FireFly Metals Limited","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":84,"url":"https://media.zenfs.com/en/globenewswire.com/8ed1c3c32f92c55bf47bfac224d3935a"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/EB9aF9RAtAG_Mfy60jt99Q--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTExODtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/8ed1c3c32f92c55bf47bfac224d3935a","width":300,"height":84}},"lazy":false},{"type":"text","content":"Preliminary Economic Assessment on Green Bay Copper-Gold Project on track for completion in the June 2026 quarter, highlighting the value of the world-scale Resource","length":170,"tagName":"p"},{"type":"text","content":"HIGHLIGHTS","length":10,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Total Green Bay Mineral Resource increased to 50.4Mt @ 2.0% Copper Equivalent (CuEq) in the Measured & Indicated (M&I) categories plus 29.3Mt @ 2.5% CuEq in the Inferred category:","length":187,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"This was a 51% increase from the previous Mineral Resource Estimate (MRE) of October 2024","length":89,"tagName":"p"}]},{"val":[{"type":"text","content":"Contained copper increased to 863kt M&I (+113%) plus 566kt Inferred","length":71,"tagName":"p"}]},{"val":[{"type":"text","content":"Contained gold increased to 546koz M&I (+174%) plus 563koz Inferred (+62%) (see ASX announcement dated 18 November 2025)","length":124,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":284,"olType":false}]},{"val":[{"type":"text","content":"FireFly has established a high-grade core comprising 8.8Mt @ 3.9% CuEq in the M&I and 10.9Mt @ 3.8% CuEq in the Inferred categories, materially enhancing development options (see ASX announcement dated 27 October 2025)","length":222,"tagName":"p"}]},{"val":[{"type":"text","content":"Importantly, the highly valuable M&I categories of Mineral Resource at the Ming Deposit have grown by 121% (from 21.5Mt to 47.5Mt) and now make up 67% of the Ming Deposit Mineral Resource. This is significant as the M&I Resources will underpin economic studies (see ASX announcement dated 18 November 2025)","length":314,"tagName":"p"}]},{"val":[{"type":"text","content":"Exceptional drilling re...

More updates from Firefly Metals Ltd

Mineral ResourceMineral ResourceFireFlyGreen BayMineral Resource EstimateGreen BayThe CompanyGreen Bay Copper-Gold ProjectFireFly Metals Ltd