Business

Fathom Announces Completion of the Gochager Lake Summer Field Exploration Program and Further "Footprint" Expansion Along Strike

Calgary, Alberta--(Newsfile Corp. - August 18, 2025) - Fathom Nickel Inc. (CSE: FNI) (FSE: 6Q5) (OTCQB: FNICF) (the "Company" or "Fathom") is pleased to announce the completion of the summer field exploration program at the Gochager Lake Project. The Gochager Lake Project Summer Field Program (the "Program") Highlights:2,926 B-horizon soil samples were collected from 3,183 designated sites. 337 rock samples, consisting of both chip samples and grab samples were collected from various outcrop ...

articleFathom Nickel, Inc.August 18, 20257/company/fathom-nickel-inc/news/fathom-announces-completion-gochager-lake-115000238
Fathom Announces Completion of the Gochager Lake Summer Field Exploration Program and Further "Footprint" Expansion Along Strike

About this update from Fathom Nickel, Inc.

[{"type":"text","content":"Calgary, Alberta--(Newsfile Corp. - August 18, 2025) - Fathom Nickel Inc. (CSE: FNI) (FSE: 6Q5) (OTCQB: FNICF) (the "Company" or "Fathom") is pleased to announce the completion of the summer field exploration program at the Gochager Lake Project.","length":266,"tagName":"p"},{"type":"text","content":" The Gochager Lake Project Summer Field Program (the "Program") Highlights:","length":84,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"2,926 B-horizon soil samples were collected from 3,183 designated sites.","length":72,"tagName":"p"}]},{"val":[{"type":"text","content":"337 rock samples, consisting of both chip samples and grab samples were collected from various outcrop locations.","length":113,"tagName":"p"}]},{"val":[{"type":"text","content":"All 337 samples were analysed on-site by pXRF for nickel-copper-cobalt-sulphur and key mafic-ultramafic rock pathfinder elements (chrome and magnesium).","length":152,"tagName":"p"}]},{"val":[{"type":"text","content":"Multiple well-mineralized samples have been submitted for multi-element assay along with a select number of samples for whole rock geochemical analysis.","length":152,"tagName":"p"}]},{"val":[{"type":"text","content":"Unfortunately, due to a lightning-induced wildfire in the Gochager Lake area, the field crew was evacuated, and the Program was cut short by three days. Despite the truncated program, the crew was able to complete approximately 90% of the intended soil geochemistry sampling coverage.","length":284,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":773,"olType":false},{"type":"text","content":"The Program summary is presented in Figures 1 & 2. ","length":54,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Figure 1 illustrates the extension of the soil geochemistry along strike to the northeast and southwest of the area where the 2024 soil geochemistry survey was performed.","length":170,"tagName":"p","attribs":{}},{"type":"list","items":[{"val":[{"type":"text","content":"The 2025 program has added approximately 3.5km of coverage to the northeast and approximately 2.5km of coverage to the southwest.","length":129,"tagName":"p"}]},{"val":[{"type":"text","content":"Note: the areas to the southwest that are not highlighted in grey, are the areas where crews were unable to c...

More updates from Fathom Nickel, Inc.

Gochager LakeGochager Lake Projectsoil samplesmineralizationultramafic rockFathomexploration program