Business

Faraday Future Further Preps and Validates Manufacturing Equipment for Hanford Plant Installation

Faraday Future (FF), in partnership with Gonzales Group, unveiled an inside look at the fully automated system that will manufacture the FF 91’s lightweight

articleFaraday Future Intelligent Electric Inc.September 30, 20215/company/faraday-future-intelligent-electric-inc/news/faraday-future-further-preps-and-validates-manufacturing-equipment-for-hanford-plant-installation
Faraday Future Further Preps and Validates Manufacturing Equipment for Hanford Plant Installation

About this update from Faraday Future Intelligent Electric Inc.

[{"type":"text","content":"\n\nFaraday Future (FF), in partnership with Gonzales Group, unveiled an inside look at the fully automated system that will manufacture the FF 91’s lightweight aluminum closures. FF is on schedule to deliver its ultimate intelligent techluxury FF 91\n\n\nFF is also currently ramping up hiring efforts for the Hanford facility and expects to continue to increase hiring there in the coming months. Top-level positions are being recruited now, in vehicle assembly, paint, body and propulsion assembly\n\n\n LOS ANGELES--(BUSINESS WIRE)--\nFaraday Future Intelligent Electric Inc. (“FF”) (NASDAQ: FFIE), a California-based global shared intelligent mobility ecosystem company, today unveiled an inside look at an important milestone in the implementation of its manufacturing process for the FF 91. The new video highlights Gonzalez Group preparing and testing equipment for future installation at the FF manufacturing plant in Hanford, CA.\nThis press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20210930005955/en/Faraday Future Further Preps and Validates Manufacturing Equipment for Hanford Plant Installation (Photo: Business Wire)\nThe recent video showcases the fully automated system to manufacture the lightweight aluminum closures for the FF 91, and also features part of robot health check and dry run activity. This necessary step is part of the programming confirmation with FF supplier (Gonzalez Group) as preparation for production builds which will be built at our Hanford Manufacturing facility. A link to the full video can be found here: https://genesis-cdn.ff.com/press_room/2126_Gonzalez_EditTA_v03B_ffcom.mp4\n\n“This next step in the manufacturing process will ensure we’re prepared for our upcoming pre-production builds,” said Matt Tall, Vice President of Manufacturing. “We’re incredibly excited to continue on this path and deliver the ultimate intelligent techluxury FF 91 on schedule.”\n\nFF continues to prepare the Hanford manufacturing site for the installation of manufacturing equipment, which will now speed up due to funding received in connection with its recent listing as a public company on Nasdaq. The resources to complete the Hanford manufacturing plant are in-hand, with construction and equipment installation mapped out to meet its production goal, which is within 12 months...

More updates from Faraday Future Intelligent Electric Inc.