Business
Boxxer Updates Diamond Drilling Program and Outlines Multiple TITAN-24 DCIP & MT Targets on Boss Project
Jun. 28, 2011 (Filing Services Canada) -- Boxxer Gold Corp. (BXX - TSX Venture, BXXRF - OTC Pin...

About this update from Exgen Resources Inc.
[{"type":"text","content":"\nBoxxer Updates Diamond Drilling Program and Outlines Multiple TITAN-24 DCIP & MT Targets on Boss Project\n\n Jun. 28, 2011 (Filing Services Canada) -- Boxxer Gold Corp. (BXX - TSX Venture, BXXRF - OTC Pink),  is pleased to provide an update of the results from the diamond drilling program and the Quantec TITAN-24 DCIP/MT survey completed over the northern portion of its 100% owned Boss copper-gold project located in the Goodsprings Mining District, southern Nevada. Diamond Drill Hole (\"DDH\") DDH-07-2011 intersected three intervals of visible oxide copper (malachite-copper oxide mineral) mineralization. The Quantec survey covered a large area around the former Oro Amigo (copper-gold) mine and the Keystone Thrust fault. The results of the three Titan-24 surveys completed in this portion of the Boss project have been compiled into a three dimensional (\"3D\") model. The results from the structural geological study should be received in the next couple of weeks. Highlights: a) Diamond Drill Hole (\"DDH\") DDH-07-2011 intersected three intervals of visible oxide copper mineralization from 0 to 37.1m, from 139.3 to 145.7m and from 200.6 to 207.9m   The drilling program has been suspended until mid-late September due to extreme temperature conditions, b) Target BE#1 (positive chargeability and low resistivity) that was previously tested by DDH-03-2010  has been more precisely defined and measures approximately 1,000m by 1,000m at a depth of 300m below surface. A compilation of the three Titan-24 surveys that covered this target, suggests that the original DDH-03-2010 may have been drilled on the edge of the chargeability anomaly,c) Target BE#6 is a large almost circular shaped area (approximately 1,500m long by 2,000m wide at a depth of 300m below surface) of positive chargeability and moderate resistivity centered around the former Oro Amigo copper-gold mine,d) Target BE#7 is a continuous northeast trending zone (approximately 500m wide) of positive chargeability that extends from west of the former Boss Mine (copper-gold producer), through the Breccia zone and past the Oro Amigo mine (copper-gold) a distance of 6.0 kilometers.  This anomaly appears to intersect the large circular anomaly located around the former Oro Amigo mine, and e) Geochemical results show that DDH-04-2011, DDH-05-2...