Business
Maurel & Prom: Start of Construction of Quilemba Solar Photovoltaic Power Plant in Angola
PARIS, May 21, 2025--Regulatory News: Maurel & Prom (Paris:MAU):
About this update from Etablissements Maurel & Prom Sa
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":1024,"height":512,"url":"https://media.zenfs.com/en/business-wire.com/f336ed7cff6ab958a247bbfa4bc8bae8"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/VsDTePrOq835OFXMt4SRtA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ4MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/f336ed7cff6ab958a247bbfa4bc8bae8","width":960,"height":480},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/80tUxKemPoDQ0hZPdaObog--/YXBwaWQ9aGlnaGxhbmRlcjt3PTIwNDg7aD0xMDI0O2NmPXdlYnA-/https://media.zenfs.com/en/business-wire.com/f336ed7cff6ab958a247bbfa4bc8bae8","width":1024,"height":512}},"lazy":false},{"type":"text","content":"PARIS, May 21, 2025--(BUSINESS WIRE)--Regulatory News:","length":54,"tagName":"p"},{"type":"text","content":"Maurel & Prom (Paris:MAU):","length":30,"tagName":"p"},{"type":"text","content":"The Angolan company Quilemba Solar Lda, a joint venture between TotalEnergies (51%), Sonangol (30%) and Maurel & Prom (19%), has begun construction work on the Quilemba photovoltaic power plant, located near Lubango in southern Angola.","length":239,"tagName":"p"},{"type":"text","content":"The Quilemba photovoltaic power plant, with an initial capacity of 35 MWp and the possibility of adding 45 MWp in a second phase, is scheduled to come on stream during the first half of 2026. The project will be the largest privately-owned photovoltaic power plant in Angola and will contribute to the decarbonization of the country's energy mix by supplying renewable electricity to nearly 40,000 homes.","length":408,"tagName":"p"},{"type":"text","content":"The groundbreaking ceremony took place on May 16, 2025 in Lubango, in the presence of the Vice-Governor of Huíla Province, the Secretary of State for Oil and Gas, the Secretary of State for Energy, the Chairman of the Board of Directors of the National Oil and Gas Agency, the French Ambassador to Angola, local traditional authorities and all partners.","length":353,"tagName":"p"},{"type":"text","content":"Olivier de Langavant, Chief Executive Officer of M&P, said:"We are very pleased to contribute to the realization of the Quilemba solar power plant, a project that is perfectly in line with our ambitions in terms of sustainable development. For M&P'...