Business
Equinox Gold Updates Canadian Operations Technical Outlook: Average 540,000 Ounces Gold Production per Year for Next 10 Years
VANCOUVER, British Columbia, March 30, 2026 (GLOBE NEWSWIRE) -- Equinox Gold Corp. (TSX: EQX, NYSE American: EQX) (“Equinox Gold” or the “Company”) is pleased to report results from updated technical reports for its Greenstone Gold Mine (“Greenstone”) located in Ontario, Canada and its Valentine Gold Mine (“Valentine”) located in Newfoundland & Labrador, Canada. In addition, the Company today reported its Mineral Reserves and Mineral Resources as at December 31, 2025, including 19 million ounces
About this update from Equinox Gold Corp.
[{"type":"image","alt":"Equinox Gold Corp.","displaySize":"","headline":null,"caption":"Equinox Gold Corp.","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":81,"url":"https://media.zenfs.com/en/globenewswire.com/7942b8df908c7d6681c896c9de7cdf7a"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/qdrOO8rZWajbgIV0WcTfVQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTExMw--/https://media.zenfs.com/en/globenewswire.com/7942b8df908c7d6681c896c9de7cdf7a","width":300,"height":81}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, March 30, 2026 (GLOBE NEWSWIRE) -- Equinox Gold Corp. (TSX: EQX, NYSE American: EQX) (“Equinox Gold” or the “Company”) is pleased to report results from updated technical reports for its Greenstone Gold Mine (“Greenstone”) located in Ontario, Canada and its Valentine Gold Mine (“Valentine”) located in Newfoundland & Labrador, Canada. In addition, the Company today reported its Mineral Reserves and Mineral Resources as at December 31, 2025, including 19 million ounces of gold in Mineral Reserves, 19 million ounces in Measured and Indicated Mineral Resources exclusive of Mineral Reserves, and 11 million ounces in Inferred Mineral Resources. For a detailed summary by asset, refer to the Company’s Annual Information Form, which will be available for download later today on SEDAR+ at www.sedarplus.ca, on EDGAR at www.sec.gov/edgar and on Equinox Gold’s website at www.equinoxgold.com. All dollar figures are in United States dollars unless otherwise noted.","length":1001,"tagName":"p"},{"type":"text","content":"Darren Hall, Chief Executive Officer, commented: “Our immediate focus at Greenstone is executing the ramp-up and achieving sustained nameplate milling capacity of 27,000 tonnes per day. Delivering consistent performance at this level will establish Greenstone as a cornerstone asset within our portfolio. At this throughput rate, the updated technical report outlines an operation expected to average approximately 320,000 ounces of gold annually over the next decade, representing a strong outcome for a long-life asset located in a Tier 1 jurisdiction.","length":554,"tagName":"p"},{"type":"text","content":"“Once we achieve stable nameplate performance, we see additional opportunities to further optimize the operation and create value. These include increasing mill throughput toward 30,00...