Business
Equinox Gold Delivers Strong First Quarter with 197,628 Ounces of Gold Production, $990 Million of Debt Reduction and Inaugural Dividend Payment
VANCOUVER, British Columbia, April 09, 2026 (GLOBE NEWSWIRE) -- Equinox Gold Corp. (TSX: EQX, NYSE American: EQX) (“Equinox Gold” or the “Company”) is pleased to announce production results for the three months ended March 31, 2026 (“Q1” or the “Quarter”), along with an update on operations at its two Canadian cornerstone assets: Valentine Gold Mine (“Valentine”) in Newfoundland & Labrador and Greenstone Gold Mine (“Greenstone”) in Ontario. All dollar figures are in United States dollars unless
About this update from Equinox Gold Corp.
[{"type":"image","alt":"Equinox Gold Corp.","displaySize":"","headline":null,"caption":"Equinox Gold Corp.","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":81,"url":"https://media.zenfs.com/en/globenewswire.com/7942b8df908c7d6681c896c9de7cdf7a"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/qdrOO8rZWajbgIV0WcTfVQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTExMw--/https://media.zenfs.com/en/globenewswire.com/7942b8df908c7d6681c896c9de7cdf7a","width":300,"height":81}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, April 09, 2026 (GLOBE NEWSWIRE) -- Equinox Gold Corp. (TSX: EQX, NYSE American: EQX) (“Equinox Gold” or the “Company”) is pleased to announce production results for the three months ended March 31, 2026 (“Q1” or the “Quarter”), along with an update on operations at its two Canadian cornerstone assets: Valentine Gold Mine (“Valentine”) in Newfoundland & Labrador and Greenstone Gold Mine (“Greenstone”) in Ontario. All dollar figures are in United States dollars unless otherwise noted.","length":520,"tagName":"p"},{"type":"text","content":"Darren Hall, CEO of Equinox Gold, commented: “Equinox Gold delivered a strong first quarter, producing 197,628 ounces (“oz”) of gold, including 87,402 oz from our two Canadian operations. Canadian production is expected to be weighted to the second half of the year as the assets continue to ramp-up, supported by steady contributions from Nicaragua and Mesquite. Together, our operations are expected to generate strong cash flow in the current gold price environment, supporting the implementation of a two-pronged capital return program.","length":540,"tagName":"p"},{"type":"text","content":"“At Greenstone, improvement programs initiated in 2025 continue to deliver positive results with winter mining rates averaging 180,248 tonnes per day (“tpd”), consistent with expectations and Q4 2025 performance. Q1 2026 mill throughput averaged 24,544 tpd, with 51% of days exceeding nameplate capacity (27,000 tpd) compared to 36% in Q4 2025. The team is focused on continued optimization and unlocking further value from the asset, consistent with the long-term profile outlined in the updated technical report.","length":519,"tagName":"p"},{"type":"text","content":"“Valentine continues to ramp-up well with the process plant averaging 6,192 tpd, or 90% of nameplate capa...