Business
Envirotech Moves From Paper To Production As Global Drone Program Advances Through FAA and ENAC Certification
HOUSTON, TX / ACCESS Newswire / November 13, 2025 / Envirotech Vehicles, Inc. (NASDAQ:EVTV) ("EVTV" or the "Company"), a U.S. manufacturer of zero-emission commercial vehicles and industrial-grade drones, today announced that its heavy capacity drone ...

About this update from Envirotech Vehicles, Inc.
[{"type":"text","content":"HOUSTON, TX / ACCESS Newswire / November 13, 2025 / Envirotech Vehicles, Inc. (NASDAQ:EVTV) ("EVTV" or the "Company"), a U.S. manufacturer of zero-emission commercial vehicles and industrial-grade drones, today announced that its heavy capacity drone division, AG Drone Inc., has entered the production and certification execution phase following confirmed deposits for 80 heavy capacity drones from Studio di Agronomia Baffetti (Siena, Italy) ("Studio Baffetti") and Venture Air Solutions Inc. (Opa-Locka, Florida) ("Venture Air Solutions").","length":582,"tagName":"p"},{"type":"text","content":""We're moving from paper to production," said Elgin Tracy, Chief Operating Officer of EVTV. "The 80 deposits confirmed overseas demand for our heavy capacity drone platform. Now it's about disciplined execution - Federal Aviation Administration and Ente Nazionale per l'Aviazione Civile ("ENAC") certification, manufacturing ramp-up, and on-time delivery. We expect that every key performance indicator we set will be performance-driven and anchored in real deliverables."","length":514,"tagName":"p"},{"type":"text","content":"2025 - 2026 Strategic Key Performance Indicators and Program Milestones","length":71,"tagName":"p"},{"type":"table","headerItems":[],"items":[{"val":[{"style":"padding:0in 5.4pt;vertical-align:top;width:119.55pt;","val":[{"type":"text","content":"Key Metric","length":10,"tagName":"p"}]},{"style":"padding:0in 5.4pt;vertical-align:top;width:111.4pt;","val":[{"type":"text","content":"Target","length":6,"tagName":"p"}]},{"style":"padding:0in 5.4pt;vertical-align:bottom;width:92.95pt;","val":[{"type":"text","content":"Status","length":6,"tagName":"p"}]},{"style":"padding:0in 5.4pt;vertical-align:top;width:108.1pt;","val":[{"type":"text","content":"Timeline","length":8,"tagName":"p"}]}]},{"val":[{"style":"padding:0in 5.4pt;vertical-align:top;width:119.55pt;","val":[{"type":"text","content":"Full-Scale Prototype & Flight Validation","length":44,"tagName":"p"}]},{"style":"padding:0in 5.4pt;vertical-align:top;width:111.4pt;","val":[]},{"style":"padding:0in 5.4pt;vertical-align:top;width:92.95pt;","val":[{"type":"text","content":"Completed","length":9,"tagName":"p"}]},{"style":"padding:0in 5.4pt;vertical-align:top;width:108.1pt;","val":[]}]},{"val":[...