Business
Entrée Resources Announces Drill Results from Hugo North Extension, Including 260 Metres Grading 4.45% CuEq
VANCOUVER, British Columbia, May 14, 2025 (GLOBE NEWSWIRE) -- Entrée Resources Ltd. (TSX:ETG...

About this update from Entree Resources Ltd
[{"type":"text","content":"Entrée Resources Announces Drill Results from Hugo North Extension, Including 260 Metres Grading 4.45% CuEq\n\n\n\n VANCOUVER, British Columbia, May 14, 2025 (GLOBE NEWSWIRE) -- Entrée Resources Ltd. (TSX:ETG; OTCQB:ERLFF – the “\n \n Company\n \n ” or “\n \n Entrée\n \n ”) is pleased to provide analytical results for one surface diamond drill hole (“\n \n DDH\n \n ”) and six underground DDHs completed during 2022 and 2024 at the Hugo North Extension (“\n \n HNE\n \n ”) deposit on the Entrée/Oyu Tolgoi Joint Venture property (the “\n \n Entrée/Oyu Tolgoi JV Property\n \n ”) in Mongolia. Analytical results are also provided for two DDHs from the 2024 regional drilling campaign on the Shivee Tolgoi mining licence.\n \n\n\n DRILL HOLE HIGHLIGHTS\n \n\n\n\n\n HNE Surface Drill Holes\n \n\n\n\n\n\n UGD189B\n \n : 552 metres (“\n \n m\n \n ”) grading\n \n 3.11% copper equivalent (“CuEq”)\n \n , including 260 m grading\n \n 4.45% CuEq\n \n .\n \n\n\n\n\n\n HNE Underground Drill Holes\n \n\n\n\n\n\n UGD871\n \n : 197 m grading\n \n 1.29% CuEq\n \n , including 89 m grading\n \n 1.59% CuEq\n \n .\n \n\n\n\n\n UGD873A\n \n : 279 m grading\n \n 1.22% CuEq\n \n .\n \n\n\n\n\n UGD876\n \n : 169.3 m grading\n \n 3.21% CuEq\n \n , including 112 m grading\n \n 3.83% CuEq\n \n .\n \n\n\n\n\n Note: CuEq for HNE is defined in Note 3 to Tables 1 and 2 below, where details on the drill hole assay intervals are also found.\n \n\n\n\n HNE DRILLING RESULTS\n \n\n\n The new drill hole analytical results from the HNE deposit were recently made available by the Company’s joint venture partner Oyu Tolgoi LLC (“\n \n OTLLC\n \n ”) and include one surface DDH and five underground DDHs completed during 2024 on the Shivee Tolgoi mining licence, as well as one underground drill hole from the 2022 program. The surface drill hole was collared on the Entrée/Oyu Tolgoi JV Property and the underground drill holes were all collared from existing infrastructure on the Oyu Tolgoi mining licence and drilled towards the north or northeast onto the Entrée/Oyu Tolgoi JV Property, targeting mineralization within, or surrounding the existing footprint of the HNE deposit (Figure 1). Full details about the 2022 and 2024...