Business

InvestmentPitch Media Video Discusses Engineer Gold Mines' Underground Sampling Program Including 547 gpt Gold Near Atlin BC - Video Available on Investmentpitch.com

Vancouver, British Columbia--(Newsfile Corp. - December 16, 2019) - Engineer Gold Mines (TSXV:...

articleEngineer Gold Mines Ltd.December 16, 20195/company/engineer-gold-mines-ltd/news/investmentpitch-media-video-discusses-engineer-gold-mines-underground-sampling-program-including-547-gpt-gold-near-atlin-bc-video-available-on-investmentpitchcom
InvestmentPitch Media Video Discusses Engineer Gold Mines' Underground Sampling Program Including 547 gpt Gold Near Atlin BC - Video Available on Investmentpitch.com

About this update from Engineer Gold Mines Ltd.

[{"type":"text","content":"InvestmentPitch Media Video Discusses Engineer Gold Mines' Underground Sampling Program Including 547 gpt Gold Near Atlin BC - Video Available on Investmentpitch.comVancouver, British Columbia--(Newsfile Corp. - December 16, 2019) - Engineer Gold Mines (TSXV: EAU) announced results from its underground sampling program at the Engineer Gold Mine property in northern BC - highlighted by 2 high-grade gold samples of 547 grams per tonne and 9.67 grams per tonne. The company is focused on the exploration and development of its 100% owned, 14,000-hectare Engineer Gold Mine Property, which is centered around the historic, high-grade, Engineer Gold Mine located 32 kilometers southwest of the town of Atlin in northwestern BC.For more information, please view the InvestmentPitch Media \"video\" which provides additional information about this news and the company. If this link is not enabled, please visit www.InvestmentPitch.com and enter \"Engineer\" in the search box.Cannot view this video? Visit:http://www.investmentpitch.com/video/0_0kmpxcuw/Engineer-Gold-Mines-Samples-547-gpt-Gold-at-Engineer-Gold-Mine-Property-in-BCThe historic Engineer Gold Mine produced 18,000 ounces of high-grade gold at 39 grams per tonne between 1912 and 1927 - and also according to the company's 2018, 43-101 technical report, has an inferred resource that includes 20,100 ounces of gold at 60 grams per tonne or 1 3/4 ounces per ton in the Engineer Vein.Engineer successfully dewatered the entire Engineer gold mine in October of this year and initiated an underground geological mapping and panel sampling program on the lowermost 8 Level, which consists of a 1,067-metre network of historic drifts, stopes and crosscuts. A total of six muck samples and 24 composite chip samples were collected during a four-day sampling program. Unfortunately, due to a catastrophic pump failure, the sampling crews only had 11 days to establish provisional air and water services and conduct a preliminary muck and composite chip sampling program on segments of the Double Decker, Engineer and Shear A zone on 8 Level. The company's work crews were able to access the historic production stope at the south end of the Double Decker vein. Five samples were collected from the muck piles remaining on the stope floor and a sixth sample was collected from inside one of the draw chutes. All six s...

More updates from Engineer Gold Mines Ltd.