Business
Engineer Gold Mines Ltd. Provides Update on Compilation & Targeting Work Along Strike from Wann River Area at Anyox-Rodeo Cu-Ni-Pt-Pd Showing
(TheNewswire) Vancouver, BC - TheNewswire - March 15, 2023 - Engineer Gold Mines ...

About this update from Engineer Gold Mines Ltd.
[{"type":"text","content":"Engineer Gold Mines Ltd. Provides Update on Compilation & Targeting Work Along Strike from Wann River Area at Anyox-Rodeo Cu-Ni-Pt-Pd Showing\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Vancouver,\n \n \n BC - TheNewswire -\n \n \n March 15, 2023 -\n \n Engineer Gold\nMines Ltd. (“\n \n the Company\n \n ”\nor “\n \n Engineer\n \n ”)\n \n (TSX-V:EAU)\n \n \n (\n \n \n OTC:EGMLF\n \n \n )\n \n is pleased\nto provide an update on its 100%-owned\n \n Engineer District\n \n property, which covers\n29,593.47 hectares in a 35 km-long contiguous claim grouping near\nAtlin in northwest British Columbia. The Property includes the\nhistorical high-grade Engineer Gold Mine, the TAG developed prospect,\nand several other high-grade vein and shear-hosted bulk tonnage gold\ntargets, as shown in Figure 1 below. The Company is currently\ncompiling prior owner and historical data to identify opportunities\nfor development and discovery. Anyox-Rodeo is a massive sulphide\nshowing in an under-explored area within the Wann River drill permit\narea, where the Company intends to focus its’ 2023 exploration\nefforts.\n \n \n \n Chris Huggins, President & CEO of Engineer Gold\nMines Ltd., stated “The over 5 km of unexplored strike length of the\nLlewellyn fault zone corridor extending southeast from the Wann River\nvein system towards Anyox-Rodeo and beyond offers an exciting\nopportunity for discovery in a historical but very under-explored\narea.\n \n ”\n \n \n The\n \n Anyox-Rodeo\n \n showing comprises massive pyrrhotite veins\nexposed on the southwest bank of the lower Wann River. Reportedly, a 6\nm adit was excavated over a copper seam here in 1900 but was\nsubsequently flooded by the Engineer Gold Mine’s hydro dam in 1924\n(PF810417, BC Minfile). Historic workings include an adit and two\nshallow pits, from which a 2008 grab sample of massive pyrrhotite\nfragments and oxidized spoils returned 0.34% copper, 0.41% nickel,\n0.11% cobalt, 0.07 g/t platinum, and 0.2 g/t palladium (Aspinall,\n2009; AR 30601). The showing occurs within the Llewellyn fault zone\ncorridor, approximately 1280 m along strike from the extent of known\nmineralization in the\n \n Wann River\n \n area, where precious and\nbase-metal enriched veins have been sampled over an area of 800 m x\n1...