Business
Energy Vault Begins Construction of 150 MW SOSA Energy Center in Texas’ ERCOT Market in Q4 2025, Bringing Total Asset Vault Portfolio Under Operation & Construction to Over 340 MW While Growing Cash in the Quarter by ~65% to Over $100 Million
WESTLAKE VILLAGE, Calif., January 05, 2026--Energy Vault Holdings, Inc. (NYSE: NRGV) ("Energy Vault"), a leader in sustainable, grid-scale energy storage solutions, today announced the start of construction of the SOSA Energy Center, a 150 MW/300 MWh battery energy storage system (BESS) located in Madison County, Texas. The project, originally developed by Savion, a subsidiary of Shell plc, was formally acquired by Energy Vault in Q4 2025 under its Asset Vault platform, and is expected to achiev
About this update from Energy Vault Holdings, Inc.
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":462,"url":"https://media.zenfs.com/en/business-wire.com/49ed04900e394017205220b28944df4d"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/jOziBdlMI8N0li9Jn5wldw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTkyNDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/49ed04900e394017205220b28944df4d","width":480,"height":462}},"lazy":false},{"type":"text","content":"Major milestone of fourth Asset Vault project now under construction, ‘safe harbored’ and FEOC compliant as part of broader investment program executed in Q4 2025 for multiple projects","length":184,"tagName":"p","attribs":{}},{"type":"text","content":"Previously acquired from Royal Dutch Shell’s subsidiary Savion, SOSA Energy Center estimates commercial operation by Q2 2027 with expected total revenue of $350M+ over the technical life, or ~$17-20 million of recurring annual, high margin revenues","length":248,"tagName":"p","attribs":{}},{"type":"text","content":"Asset Vault successfully commenced off-site construction in Q4 2025 of three additional projects in its near-term pipeline with expected commercial operation between Q4 2027 and Q4 2028","length":185,"tagName":"p","attribs":{}},{"type":"text","content":"Increased cash and liquidity ~65% in Q4 2025 to over $100 million -- above the high end of the guidance range – well positioned to execute on the Company’s energy asset management strategy","length":188,"tagName":"p","attribs":{}},{"type":"text","content":"WESTLAKE VILLAGE, Calif., January 05, 2026--(BUSINESS WIRE)--Energy Vault Holdings, Inc. (NYSE: NRGV) ("Energy Vault"), a leader in sustainable, grid-scale energy storage solutions, today announced the start of construction of the SOSA Energy Center, a 150 MW/300 MWh battery energy storage system (BESS) located in Madison County, Texas. The project, originally developed by Savion, a subsidiary of Shell plc, was formally acquired by Energy Vault in Q4 2025 under its Asset Vault platform, and is expected to achieve commercial operation by Q2 2027.","length":561,"tagName":"p"},{"type":"text","content":"The construction milestone represents a significant advancement in Energy Vault's "Own & Operate" asset management strategy and demonstrates the com...