Business

Technology Update

Technology Update.

articleEnergy B PlcSeptember 6, 20234/company/energy-b-plc/news/technology-update-5
Technology Update

About this update from Energy B Plc

[{"type":"text","content":"\n\n \n \n\n\n\n\n6 September 2023\nHydrogen Future Industries plc \n(\"HFI\" or the \"Company\")\n \nTechnology Update\n \nHydrogen Future Industries plc (AQSE: HFI), a developer of a proprietary wind-based green hydrogen production system, is pleased to provide the following update on its testing and development activities, including initial data which is supportive of wind tunnel results from earlier prototypes.\n \nWind Turbine\n \nHFI has completed the construction and installation of its latest, upgraded 1 metre diameter wind turbine prototype in Montana, USA, with testing and data gathering now underway. \n \nThe current turbine is the 3rd version of the design since the Company acquired a suite of relevant patents, as announced on 5 October 2022. The upgraded wind turbine will be used to measure the energy output over an extended period before work commences on a larger diameter commercial scale wind turbine. As announced on 24 May 2023, the data gained from the performance of the wind turbine will be compared to the wind tunnel results and used in the design of the larger diameter wind turbines. Initial data from the limited testing to date is supportive of wind tunnel results from earlier prototypes. The Board believes that the data is supportive of the system's capacity to produce low-cost renewable energy and therefore affordable green hydrogen. \n \n\n \nElectrolyser \n \nAs announced on 24 May 2023, concept testing of an electrolyser for the hydrogen production system continues in California where HFI's advisory board member and quantum-physicist Dr Nicholas Blake is based. The objective of the testing is to build an Anion Exchange Membrane Water Electrolyser (AEMWE) without platinum group metal catalysts but with cheaper and more readily available materials that improves power efficiency and longevity. \n \nDr Blake has now completed the build of two complete electrolyser test cells. The series of tests undertaken achieved an exceptional efficiency of up to 97%. Further test results are expected in the coming weeks. To date, HFI has tested 30 different electrodes, including the current catalysts to demonstrate the efficiency gains from the Company's design. Following the completion of the initial test phase, the Company will lodge various patent applications before proc...

More updates from Energy B Plc