Business
Enduro Intersects 8.85m of 31.09 g/t Gold and 1.07% Copper in NE Extension of McLymont Fault
Kelowna, British Columbia--(Newsfile Corp. - October 21, 2020) -   Enduro Metals Corp...

About this update from Enduro Metals Corporation
[{"type":"text","content":"Enduro Intersects 8.85m of 31.09 g/t Gold and 1.07% Copper in NE Extension of McLymont FaultKelowna, British Columbia--(Newsfile Corp. - October 21, 2020) -  Enduro Metals Corporation (TSXV: ENDR) (OTC Pink: SIOCF) (FSE: SOG-FF) (\"Enduro\" or the \"Company\") is pleased to report its first-received drilling results from 2020's exploration campaign. This initial result is from the NE Extension Zone along the McLymont Fault of the Company's Newmont Lake Project, located in the heart of northwestern British Columbia's Golden Triangle. The McLymont Fault is one of four target areas on the 638 km2 Newmont Lake Project.Drill hole NW20-09 intersected 31.09 g/t Au, and 1.07% Cu over 8.85 metres starting at 159.88m downhole, including 225.30 g/t Au, and 4.90% Cu over 0.59 metres at 162.45m downhole. Mineralization was identified over a broader interval of 10.03 g/t Au, and 0.36% Cu over 28.34m starting at 144.12m with 8 individual samples containing >15 g/t Au.Hole ID:From (m)To (m)Core Length (m)Au (g/t)Ag (g/t)Cu (%)NW20-09144.12172.4628.3410.032.310.36including159.88168.738.8531.096.541.07and incl.161.90162.450.5539.7710.101.13and incl.162.45163.040.59225.3025.814.90and incl.163.04163.550.5119.465.931.75and incl.164.53165.200.6720.684.290.45and incl.165.20165.900.7047.0810.80.95and incl.165.90166.450.5536.8013.51.80and incl.166.45166.950.5042.0813.832.62and incl.167.50168.000.5015.855.260.99 Table 1: Intervals have been reported as core length as insufficient drilling has been undertaken to determine true widths of the interval at this time. The 28.34m interval was fully sampled and all uncut assays were included in the 10.03 g/t Au average.The intersect is approximately 170m northeast of the historic NW Zone along the McLymont Fault, a 160m step-out from previously reported diamond drill hole NW19-12 which intersected 44.13m of 4.03 g/t Au and 0.29% Cu (see Enduro July 28th, 2020) and is 285m step-out from previously reported diamond drill hole R-08-07's 144m of 3.18 g/t Au (see Enduro July 28th, 2020). Mineralization is associated with a swarm of quartz-carbonate veining with distinct euhedral quartz textures containing semi-massive pyrite-chalcopyrite. Fine disseminations of visible gold are common in the vein cement.NW20-09 was a \"rushed assay\" drill hole selected due to the volume of visible gold observed while dr...