Business
Endeavour Silver Produces 1,205,793 Oz Silver and 8,338 Oz Gold (1.9 Million Silver Equivalent Oz) in Q1 2025
VANCOUVER, British Columbia, April 09, 2025 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ( ...

About this update from Endeavour Silver Corp.
[{"type":"text","content":"Endeavour Silver Produces 1,205,793 Oz Silver and 8,338 Oz Gold (1.9 Million Silver Equivalent Oz) in Q1 2025\n\n\n\n\n VANCOUVER, British Columbia, April 09, 2025 (GLOBE NEWSWIRE) -- Endeavour Silver Corp.\n \n\n (“Endeavour” or the “Company”)\n \n\n (NYSE: EXK; TSX: EDR)\n \n reports first quarter 2025 production of 1,205,793 silver ounces (oz) and 8,338 gold oz, for silver equivalent\n \n (\n \n\n 1)\n \n (“AgEq”) production of 1.9 million oz.\n \n\n “Our Q1 production results highlight the strength of our operations and our focus on consistent, efficient performance,” said Dan Dickson, Chief Executive Officer. “This steady momentum lays a solid foundation for the quarters ahead, as we sharpen our operational focus and prepare to bring Terronera into production.”\n \n\n\n\n Q1 2025 Production Overview\n \n\n\n\n\n\n Guanaceví in Line with Guidance:\n \n Production in line with plan, continues at full capacity with slightly lower silver and gold grades processed than plan.\n \n\n\n\n\n Bolañitos Delivers Steady Production:\n \n Silver production was consistent with plan, while gold production was slightly below plan due to lower gold grades.\n \n\n\n\n\n Metal Sales and Inventories\n \n : Sold 1,223,684 silver ounces and 8,538 gold ounces during the first quarter. A total of 219,151 silver ounces and 715 gold ounces of bullion inventory and 31,232 silver ounces and 452 gold ounces in concentrate inventory were held at quarter end.\n \n\n\n\n\n\n Q1 2025 Mine Operations\n \n\n\n\n Consolidated silver production was 1,205,793 ounces in Q1 2025, in line with plan and 17% lower than Q1 2024. Lower silver production was driven by 24% lower silver production at the Guanaceví mine, partially offset by 53% higher silver production at the Bolañitos mine compared to the same quarter in 2024. Consolidated gold production was 8,338 ounces in Q1 2025, 18% lower than Q1 2024 due to 28% lower gold production at the Bolañitos mine, and 3% lower gold production at the Guanaceví mine.\n \n\n In Q1 2025, Guanaceví throughput was 11% lower than Q1 2024 and silver and gold grades were 13% lower and 4% higher, respectively, which drove the 24% lower silver and 3% lower gold output. Guanaceví throughput and grades were in line with plan. Sup...