Business
ENCORE ENERGY COMPLETES BASELINE WELLS INSTALLATION and BEGINS DRILLING of INJECTION AND RECOVERY WELLS AT ROSITA EXTENSION
ENCORE ENERGY COMPLETES BASELINE WELLS INSTALLATION and BEGINS DRILLING of INJECTION AND ...

About this update from Encore Energy Corp.
[{"type":"text","content":"\n \n \n \n ENCORE ENERGY COMPLETES BASELINE WELLS INSTALLATION and BEGINS DRILLING of INJECTION AND RECOVERY WELLS AT ROSITA EXTENSION\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: MIDDLE; TEXT-ALIGN: CENTER; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 1pt; BORDER-LEFT:black 1pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prntar{\nTEXT-ALIGN: RIGHT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE; BORDER-TOP:1pt black; BORDER-RIGHT:1pt black; BORDER-BOTTOM:1pt black; BORDER-LEFT:1pt black\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n TSX.V: EU\n \n \n \n OTCQB:ENCUF\n \n \n \n \n www.encoreuranium.com\n \n \n \n \n \n \n CORPUS CHRISTI, Texas\n \n \n ,\n \n \n Sept. 6, 2022\n \n \n /CNW/ -\n \n enCore Energy Corp.\n \n (\"\n \n enCore\n \n \" or the \"\n \n Company\n \n \") (TSXV: EU) (OTCQB: ENCUF) today announced the completion and installation of all (five) baseline wells within the uranium mineralization at the 100%-owned, fully licensed Rosita Extension Project Production Authorization Area (PAA) wellfield.  In addition to establishing baseline conditions in the production area, the wells returned excellent uranium values with Grade Thicknesses (GT*) ranging from 0.932 to 5.139. The Company also reports it has commenced installation of production well patterns (injection and extraction wells) at the Rosita Extension PAA,\n \n South Texas\n \n as the initial source of uranium feed for the Rosita Central In-Situ Recovery (ISR) Uranium Processing Plant.\n \n \n \n \n \n \n \n \n \n \n Highlights include:\n \n \n \n \n Baseline Drill Hole BL-41 reported 22.0 feet of mineralization grading 0.234% U\n \n 3\n \n O\n \n 8\n \n from a depth of 184 feet;\n \n \n In addition to an indication of grade of mineralization in the PAA, the baselines wells also serve to establish groundwater quality standards;\n \n \n Commencement of installation of the production well patterns (injection and recovery wells) with 5 drill rigs are curr...