Business
enCore Energy Commences Work to Restart Production at its 2nd South Texas Uranium Processing Plant
enCore Energy Commences Work to Restart Production at its 2nd South Texas Uranium Processing Plan...

About this update from Encore Energy Corp.
[{"type":"text","content":"\n \n \n \n enCore Energy Commences Work to Restart Production at its 2nd South Texas Uranium Processing Plant\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen3{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: BOTTOM; TEXT-ALIGN: LEFT; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 1pt; BORDER-LEFT:black 1pt\n}\n.prngen4{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: BOTTOM; TEXT-ALIGN: CENTER; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 1pt; BORDER-LEFT:black 1pt\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: MIDDLE; TEXT-ALIGN: CENTER; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 0.5pt solid; BORDER-LEFT:black 1pt\n}\n.prngen5{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; BORDER-BOTTOM:black 0pt; BORDER-LEFT:black 0pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prntar{\nTEXT-ALIGN: RIGHT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE; BORDER-TOP:1pt black; BORDER-RIGHT:1pt black; BORDER-BOTTOM:1pt black; BORDER-LEFT:1pt black\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n.prnml10{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.83em !IMPORTANT\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n NYSE American:EU\n \n \n \n TSXV:EU\n \n \n \n \n www.encoreuranium.com\n \n \n \n \n \n \n FUELING THE FUTURE\n \n \n \n \n \n \n CORPUS CHRISTI, Texas\n \n \n ,\n \n \n March 15, 2023\n \n \n /CNW/ -\n \n enCore Energy Corp.\n \n (\"\n \n enCore\n \n \" or the \"\n \n Company\n \n \") (NYSE American: EU) (TSXV: EU) announced today that it has made a formal production decision for the resumption of uranium production from the Alta Mesa Processing Plant (\"Alta Mesa\" or \"Plant) in early 2024. Alta Mesa will be enCore's second producing location following resumption of uranium production at the South Texas Rosita Uranium Processing Plant (\"Rosita\") scheduled for 2023.\n \n \n \n \n \n \n \n \n \n Work underway at the Alta Mesa Pro...