Business

ENCORE ENERGY ACHIEVES KEY MILESTONE WITH THE INSTALLATION OF ROSITA EXTENSION PRODUCTION AREA MONITORING WELLS

ENCORE ENERGY ACHIEVES KEY MILESTONE WITH THE INSTALLATION OF ROSITA EXTENSION PRODUCTION...

articleEncore Energy Corp.August 25, 20224/company/encore-energy-corp-1/news/encore-energy-achieves-key-milestone-with-the-installation-of-rosita-extension-production-area-monitoring-wells
ENCORE ENERGY ACHIEVES KEY MILESTONE WITH THE INSTALLATION OF ROSITA EXTENSION PRODUCTION AREA MONITORING WELLS

About this update from Encore Energy Corp.

[{"type":"text","content":"\n \n \n \n ENCORE ENERGY ACHIEVES KEY MILESTONE WITH THE INSTALLATION OF ROSITA EXTENSION PRODUCTION AREA MONITORING WELLS\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; FONT-SIZE: 8PT; FONT-FAMILY: ARIAL; COLOR: BLACK; MARGIN:0em; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 1pt; BORDER-LEFT:black 1pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prntar{\nTEXT-ALIGN: RIGHT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE; BORDER-TOP:1pt black; BORDER-RIGHT:1pt black; BORDER-BOTTOM:1pt black; BORDER-LEFT:1pt black\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n TSX.V: EU\n \n \n \n OTCQB: ENCUF\n \n \n \n \n www.encoreuranium.com\n \n \n \n \n \n \n CORPUS CHRISTI, Texas\n \n \n ,\n \n \n Aug. 25, 2022\n \n \n /CNW/ -\n \n enCore Energy Corp.\n \n (\"\n \n enCore\n \n \" or the \"\n \n Company\n \n \") (TSXV: EU) (OTCQB: ENCUF) today announced the installation and completion of all wellfield monitor wells for its Rosita Extension Production Area Authorization (\"PAA\"), located less than one mile from its 100% owned and fully licensed Rosita In-Situ Recovery (\"ISR\") Uranium Processing Plant in\n \n South Texas\n \n . The Rosita Extension PAA includes uranium mineralization extending approximately 3,000 feet in length.\n \n \n \n \n \n \n \n \n \n Highlights include:\n \n \n \n Completion of the installation of 43 monitoring wells, including 38 perimeter and 5 overlying monitor wells, at the Rosita Extension PAA. This marks a significant milestone towards ISR uranium production at the Rosita Project as a key source of fuel for safe, clean, reliable, and carbon-free nuclear energy in\n \n the United States\n \n ;\n \n \n The Rosita Extension PAA is the first production area planned as a new source of uranium for the Rosita ISR Uranium Processing Plant;\n \n \n The Rosita Extension PAA is located within the existing Radioactive Materials License, Underground Injection Control Permit and Aquifer Exemption areas at the Rosita Project;\n \n \n Future w...

More updates from Encore Energy Corp.