Business

XCharge and EnBW Begin Expanded Testing of Fast-Charging Infrastructure

HAMBURG, Germany, December 22, 2025--XCharge is cooperating in testing with EnBW on their fast-charging-network, the EnBW HyperNet in Germany. Since August 2025, EnBW has deployed one charger to complement a location near Stuttgart. Now, an important step in the collaboration was made and a field test with 10 charging stations at four different locations has started. The test includes two XCharge units at EnBW’s site in EnBW City in Stuttgart and three other sites; Rutesheim, Karlsruhe (Durlach

articleEnbw Energie Baden-wuerttemberg AgDecember 22, 20255/company/enbw-energie-baden-wuerttemberg-ag/news/xcharge-and-enbw-begin-expanded-testing-of-fast-charging-infrastructure
XCharge and EnBW Begin Expanded Testing of Fast-Charging Infrastructure

About this update from Enbw Energie Baden-wuerttemberg Ag

[{"type":"image","alt":"Source: EnBW","displaySize":"","headline":null,"caption":"Source: EnBW","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":360,"url":"https://media.zenfs.com/en/business-wire.com/f7422e642bf067ab997f4177830fd45f"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/JBEyftN4oUsBQaCmvJzn9Q--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTcyMDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/f7422e642bf067ab997f4177830fd45f","width":480,"height":360},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/fj2hfpHxBZL6ubvtmXbKmg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTY0MDtoPTQ4MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/f7422e642bf067ab997f4177830fd45f","width":480,"height":360}},"lazy":false},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":1024,"height":512,"url":"https://media.zenfs.com/en/business-wire.com/f049fe0fa315537637bcb4ed025a5153"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/QdrJcdWDq0MQnC3iu4bQCw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ4MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/f049fe0fa315537637bcb4ed025a5153","width":960,"height":480},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/8qkcmvtq0RpCsqJp3qWgFQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTY0MDtoPTMyMDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/f049fe0fa315537637bcb4ed025a5153","width":640,"height":320},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/eq9gu1r8vi3jaJ2AQeKQcw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTIwNDg7aD0xMDI0O2NmPXdlYnA-/https://media.zenfs.com/en/business-wire.com/f049fe0fa315537637bcb4ed025a5153","width":1024,"height":512}}},{"type":"text","content":"Eleven XCharge units deployed across four locations as part of EnBW’s strategic testing program","length":95,"tagName":"p"},{"type":"text","content":"HAMBURG, Germany, December 22, 2025--(BUSINESS WIRE)--XCharge is cooperating in testing with EnBW on their fast-charging-network, the EnBW HyperNet in Germany. Since August 2025, EnBW has deployed one charger to complement a location near Stuttgart. Now, an important step in the collaboration was made and a field test with 10 charging stations at four different locations has started. The test includes two XCharge units at EnBW’s site in EnBW City in Stuttgart and three other sites; Rutesh...

More updates from Enbw Energie Baden-wuerttemberg Ag

EnBWcharging stationsDC fast chargersfast-chargingEuropeXCharge Europe GmbHXChargeenergy solutions