Business
Second Eagle Ford Well Update
Second Eagle Ford Well Update.

About this update from Empyrean Energy Plc
[{"type":"text","content":"\n \nRNS Number : 1166O Empyrean Energy PLC 13 September 2011 \n \n\n \n13 September 2011\n \nEmpyrean Energy PLC\n(\"Empyrean\" or the \"Company\"; Ticker (EME))\n \nSugarloaf Project, (\"Sugarloaf\"), Block B, Texas USA\n \nEmpyrean is pleased to provide the following update on operations and production at the Sugarloaf Project within the Sugarkane Gas & Condensate Field, Texas. \nProduction Data\nThe following well has been on production for a period of 30 or 60 days and Empyrean is pleased to provide the market with an update on produced volumes during that period:-\n\n\n\n\nWell name\n\n\nWorking Interest\n\n\nTotal Gas Production (mmscf)\n\n\nTotal Condensate Production (bbls)\n\n\nAverage Daily Equivalent Oil Rate (boe/d)*\n\n\n\n\nJordan #1H - 60 day\n\n\n3.0%\n\n\n64,630\n\n\n39,036\n\n\n831\n\n\n\n\nBest Fenner #1H - 30 day\nPfeifer #1H - 30 day\nDavenport #1H - 60 day\nTurnbull #6H - 30 day\nBest Huth #1H 60 day\n\n\n3.0%\n1.9%\n1.40%\n1.02%\n0.58%\n\n\n38,725\n16,983\n53,026\n29,026\n39,707\n\n\n20,437\n20,019\n35,607\n18,097\n35,810\n\n\n896\n761\n740\n764\n707\n \n\n\n\n\n*The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio. \n \nOperations\nThe following wells have commenced production since the last operational update. Empyrean will provide further details when the wells have achieved 30 and 60 day production milestones.\n \nBrysch Jonas #1H (3.0% WI) - The Brysch Jonas #1H well went into production on 10 August 2011.\n \n\nYosko Borgfield #1H (1.51% WI) - The Yosko Borgfield #1H well went into production on 14 August 2011.\n \nIn addition the following operations have taken place:\n \nHolland Brown #1H (3.0% WI) - The well has been spudded and drilling operations are underway.\n \nHolland Opiela #1H (0.35% WI) - The well has been drilled to a total depth of 16,847 ft. Casing has been run and is presently being cemented in place.\n \nThe information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.\n \n \n \nContact:\n \nEmpyrean Energy Plc\nTom Kelly &n...