Business

Emperor Metals Intersects Near Surface Mineralization; Building Bulk Tonnage Open Pit Potential at Duquesne West Gold Project in Quebec

13.2 Metres of 3.8 g/t Au (including 5.6 m of 7.5 g/t Au) Vancouver, British Columbia--(Newsfile Corp. - December 5, 2023) - Emperor Metals Inc. (CSE: AUOZ) (OT

articleEmperor Metals, Inc.December 5, 20235/company/emperor-metals-inc/news/emperor-metals-intersects-near-surface-mineralization-building-bulk-tonnage-open-pit-potential-at-duquesne-west-gold-project-in-quebec
Emperor Metals Intersects Near Surface Mineralization; Building Bulk Tonnage Open Pit Potential at Duquesne West Gold Project in Quebec

About this update from Emperor Metals, Inc.

[{"type":"text","content":" 13.2 Metres of 3.8 g/t Au (including 5.6 m of 7.5 g/t Au) Vancouver, British Columbia--(Newsfile Corp. - December 5, 2023) - Emperor Metals Inc. (CSE: AUOZ) (OTC Pink: EMAUF) (FSE: 9NH) (\"Emperor\") is pleased to announce additional assay results from the summer 2023 drilling campaign at the Duquesne West Gold Project. A total of 14 diamond drillholes has been completed which represents 8,579 metres. Highlights DQ23-09 intersects 13.2 metres (m) of 3.8 grams per tonne (g/t) gold (Au), including 5.6 m of 7.5 g/t Au in DQ23-09 Drilling confirms Phase 1 open-pit potential DQ23-09; 5.6 m of 7.5 g/t Au exceeds the average grade of the deposit DQ23-06 intersected 5.2 meters of 2.1 g/t Au (including 1.2 m of 6.1 g/t Au) DQ23-06 expands mineralization down plunge over ½ kilometer from any known drillholes, implies additional inferred ounce potential CEO John Florek commented: \"With the recent development of identifying the open pit potential on the property, holes DQ23-09 to 14 targeted the strategic vision to expand the Phase 1 open pit potential. DQ23-09 confirms that these high-grade lenses seen at depth are expressed at surface and could make very attractive stockpiles for delivery to nearby mills. \"Only an estimated 30% of the core from historical drilling was sampled at surface by previous operators who did not examine the additional lower-grade bulk tonnage material crucial to lowering the stripping ratio. As a result of recent work to locate and sample this material in the historical core library, more than 3,000 meters of additional sampling will be sent out for assays; sampling of historical core is ongoing. \"The intercept at DQ23-06 is very significant, since it expands the mineralization by an additional 0.55 km along strike and plunge, in an area of virtually no drilling. This area has potential to add significant ounces to this deposit. \"Our vision to develop a multimillion-ounce deposit with multiple mining scenarios on the property continues to progress. The proximity to multiple mills and infrastructure in a Tier 1 mining district makes this project highly valuable compared to any competitors.\" Summary of Drill Results: DQ23-06 intersection (5.2 m of 2.1 g/t Au) was designed to extend mineralization +500 meters eastward along strike and down plunge of high-grade mineralization. It intersected mineralization predi...

More updates from Emperor Metals, Inc.