Original text
Rate this translation
Your feedback will be used to help improve Google Translate
Home
Edm Resources Inc
Pacifica Resources mobilizes for new RC drill program on the Islena Project, Chile
Published May 16 2005
5 min read

Pacifica Resources mobilizes for new RC drill program on the Islena Project, Chile

Trading Symbol:  PAX.TSX-V

VANCOUVER, BC, May 16 /CNW/ - Pacifica Resources Ltd. (PAX.TSX-V)
subsidiary Compania Mineral Latina Limitada will be commencing approximately
2,500 meters of drilling on its Islena Project near Taltal in coastal Chile on
or about the 21st of May for Phase 1 reverse circulation drilling, mainly in
the Union Mine area on its Islena Project, Chile. The Phase 1 drilling will
follow-up on the high-grade copper-silver mineralization previously
intersected in hole UN04RC-03A that graded 3.62% copper, 0.42% zinc, 0.16%
lead and 288.7 g/t silver over 8 meters in the Union Mine area (see March 22,
2004 news release), as well as test numerous peripheral iron oxide copper-gold
(IOCG) targets where there are known occurrences of low grade copper-gold
mineralization beneath pediment cover immediately along strike of the last of
the Islena workings. The Islena Trend is characterized by hematite-
chalcopyrite copper-gold mineralization of the Iron Oxide-Copper-Gold type.
The Islena Project is located east of the port city of Taltal in northern
Chile within a historic copper-gold-silver mining district in the graben of
the Atacama Fault Zone. The Atacama Fault Zone is a major structure that is
important to the localization of several very large IOCG deposits within the
copper-iron belt of coastal Chile. The deposits include Anglo American's
Mantos Blancos mine (400 million tonnes grading 1% copper) and Mantos Verde
mine (100 million tonnes grading 0.8% copper) and Phelps Dodge's Candelaria
mine (470 million tonnes grading 0.95% copper and 0.2 g/t gold). Mining of
oxide mineralization in the Union Mine recovered 84,097 tonnes with a
recovered grade of 2.50% copper and 287 g/t silver during the period 1966 to
1982. The higher grade mineralization is hosted by dark grey limey clastic
strata adjacent to the Union Fault; a post mineral fault forming the west
boundary of an uplifted block within the Atacama Fault graben.
The Islena Project is one of four copper-silver-gold projects being
explored by Pacifica in Chile that is considered to have excellent potential
for moderate tonnages of medium to high grade copper, silver, and gold
mineralization. Additional exploration is planned for these and its other
projects in Canada, as it works to advance its large Selwyn Project in the
Yukon that includes the recent acquisition of the Howard's Pass zinc-lead
properties.
The company's qualified person for the Islena Project, Chile is Jason
Dunning, M.Sc., P.Geo.

Pacifica is a junior resource company focused on exploration for base
metals in the Americas. The Company shares management with its major
shareholder, Yukon Zinc Corporation, which is developing the Wolverine zinc-
lead-copper-silver-gold deposit in south central Yukon.

This press release may contain forward-looking statements based on
assumptions and judgments of management regarding future events or results
that may prove to be inaccurate as a result of exploration and other risk
factors beyond its control and actual results may differ materially from the
expected results.

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT
RESPONSIBILITY FOR THE ADEQUACY OF THIS NEWS RELEASE.