Business

Plata Latina announces additional drill results from its Naranjillo and Vaquerias projects

/NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES/...

articleEdge Copper CorporationMay 2, 20133/company/edge-copper-corporation/news/plata-latina-announces-additional-drill-results-from-its-naranjillo-and-vaquerias-projects
Plata Latina announces additional drill results from its Naranjillo and Vaquerias projects

About this update from Edge Copper Corporation

[{"type":"text","content":"\n\n\n\n\n\n/NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN\n THE UNITED STATES/\n\n\nVANCOUVER, May 2, 2013 /CNW/ - Plata Latina Minerals Corporation (\"Plata Latina\" or the \"Company\") is pleased to announce additional drill results from its most recent\n drill program on its Naranjillo and Vaquerias projects.\n\n\nNaranjillo Property (Guanajuato state, Mexico)\n\n\nThe Company has completed 12 exploration drill holes from its most\n recent drill program on its Naranjillo project in Guanajuato state,\n Mexico, where results continue to indicate the presence of a\n significant epithermal silver-gold vein system (summary of drill\n results can be found below).  The highest values were found in\n BDD-N-37, in which the Villa hanging-wall vein averages 1,144 g/t\n silver and 3.07 g/t gold over 1.76 metres and the main Villa vein\n averages 338 g/t silver and 1.45 g/t gold over 8.89 metres for a\n combined average of 397 g/t Ag and 1.44 g/t Au over 12.67 metres.  (See\n figures 1 and 2 at the end of this press release).\n\n\nThese drill results from the Villa vein have further clarified the\n structural setting of the mineralized Villa vein system, and now\n indicate clearly that the Villa vein system is comprised of a\n hanging-wall component and a foot-wall component with the principal\n Villa vein located between these two veins.  The additional drilling\n data also demonstrates that the Villa vein system has been offset by\n several post-mineral faults and provides an indication of the\n orientation and magnitude of those offsets.  This newly-gained\n understanding of the Villa vein system as well as its fault offsets\n provides a guide for the continuing exploration of the Villa vein\n system toward its projected intersection with the buried extension of\n the Sibila vein.  This presents an attractive potential mineralized\n system for future exploration targeting on the Villa vein system over a\n potential strike length of almost 500 metres that the Company intends\n to explore with future drilling (See figures 3 and 4 at the end of this\n press release).\n\n\nIn addition to exploring toward this area along the Villa vein system,\n the Company intends to carry out exploration drilling along the Sibila\n vein, starting near previously drilled hole BDD-N-2 (0.37 metres of 440\n...

More updates from Edge Copper Corporation