Business
Eco Innovation Group (ECOX) and WRA Holdings Confirms Exclusive Rights to Use Technical Studies Prepared by Constructora Hernán Solís for Costa Rica Route 32 Private Initiative
Eco Innovation Group (ECOX) and WRA Holdings Confirms Exclusive Rights to Use Technical Studies Prepared by Constructora Hernán Solís for Costa Rica Route 32 Private Initiative.

About this update from Eco Innovation Group, Inc.
[{"type":"text","content":"\r\n\r\n \r\n \r\n Eco Innovation Group (ECOX) and WRA Holdings Confirms Exclusive Rights to Use Technical Studies Prepared by Constructora Hernán Solís for Costa Rica Route 32 Private Initiative\r\n \r\n \r\n\r\n\r\nEco Innovation Group (ECOX) and WRA Holdings Confirms Exclusive Rights to Use Technical Studies Prepared by Constructora Hernán Solís for Costa Rica Route 32 Private Initiative\r\n\r\n\r\n\r\n\r\n\r\nSCOTTSDALE, AZ / ACCESS Newswire / January 13, 2026 / Eco Innovation Group, Inc. (OTC:ECOX) (\"ECOX\" or the \"Company\") and WRA Holdings, Inc. (\"WRA\"), announced today that WRA has formally received exclusive intellectual property usage rights over a comprehensive set of technical studies, engineering plans, designs, and related documentation originally prepared by Constructora Hernán Solís S.R.L. for the private infrastructure initiative known as \"Route 32 - San José Section to National Route No. 4 Interchange\" in Costa Rica.\r\n The certification was issued by Constructora Hernán Solís S.R.L., in its capacity as the original developer and author of the technical documentation, and was formally addressed to the Consejo Nacional de Concesiones (CNC), Costa Rica's national concessions authority.\r\n Under the certification, Constructora Hernán Solís S.R.L. expressly confirms that all technical studies, plans, designs, and engineering documentation prepared by its firm for the Route 32 private initiative have been granted for the exclusive use of WRA Environmental Engineering, Inc. This exclusivity applies to all submissions, evaluations, and administrative procedures before the CNC during the pre-feasibility and feasibility stages of the concession process, either by WRA directly or by a consortium led by WRA.\r\n The certification further establishes that no other individual or legal entity is authorized to use, reproduce, or submit-in whole or in part-the technical documentation prepared by Constructora Hernán Solís S.R.L. without the prior written authorization of WRA. In addition, WRA is expressly empowered to transfer or sublicense the right of use of these technical assets to third parties, subject to formal notification to Constructora Hernán Solís S.R.L.\r\n \"This certification provides legal certainty regarding both authorship and ...